Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Lillian Simon



Contact Information

2100 Goodyear Road
Benicia, CA 94510



Telephone

(707) 742-6000



Fax

(707) 746-1603



Flatiron West Inc
is seeking qualified DBEs, MBEs, WBEs, SBEs


Project Name

Advanced Water Purification Facility & Water Pump Station



Bid/Contract #

Monterey - REBID



Awarding Agency

Monterey Regional Water Pollution Control Agency



Project Location

Marina, Monterey County, CA



Bid Date

06/29/2017 at 3::00



Project Details

REQUEST FOR CERTIFIED DBE/MBE/WBE/SBE/HUBZone SUBCONTRACTORS & SUPPLIERS:

Advanced Water Purification Facility and Product Water Pump Station Project
Owner: Monterey Regional Water Pollution Control Agency (MRWPCA)
Bid Date: June 29, 2017 at 3:00 p.m.
Clean Water State Revolving Fund Project
SWCRB Forms are REQUIRED from Subcontractors
DBE Participation Encouraged

Quotes requested for Divisions 02 through 46 for the following, but not limited to scopes of work: Trucking/Off-Haul, Survey, Demolition, Ready Mix Concrete, Concrete Formwork, Concrete Reinforcement, Hot/Cold Weather Concreting, Concrete Finishing, Grouting, Structural Metal Fasteners, Structural Metal Framing, Metal Fabrications, Aluminum Component Railing System, Fiberglass Fabrications, Waterproofing, Flashing and Sheet Metal, Roofing, Joint Sealants, Hollow Metal Work, Overhead Coiling Doors, Finish Hardware, Louvers, Metal Support Systems/Framing, Gypsum Board, Painting and Coatings, Building Specialties, Welded Steel Tanks, Metal Building Systems, Fire Suppression, Plumbing, HVAC, FRP Duct & Accessories, Electrical, Security System, Fire Alarm System, Excavation/Grading, Erosion and Sedimentation Controls, Aggregates, Asphalt Paving, Curb, Gutters and Sidewalks, Irrigation , Planting and Landscaping, Precast Concrete Utility Vaults, Precast Concrete Manholes, Storm Drainage, Instrumentation and Controls, Pipe Supply, Valve, Pumps, Storage Tanks, Blowers, Compressed Air System, Hydropneumatic Surge Tank Systems, Process Water Treatment Equipment.



Contract documents are available to download electronically, at no cost, from MRWPCA’s Procore site. To access and download the Contract Documents, send an email to Yohana Vargas at Yohana@mrwpca.com to receive a direct link. Additionally, Contract Documents are available electronically from Flatiron, at no cost, and may also be viewed in our office by appointment only. Please send an email request to jcarter@flatironcorp.com to request access to electronic documents or to make an appointment.

This is an American Iron and Steel project. Quotations must be valid for same duration as specified by Owner for contract award. Assistance in obtaining bonding, lines of credit, insurance, equipment, supplies and materials is available upon request. Flatiron West, Inc. analyzes and considers each DBE quote, including those that are broken down into economically feasible units to facilitate bidding.

Subcontractors are required to possess and maintain a current contractor’s license and must also be registered with the Department of Industrial Relations (DIR) as required by Public Contract Code Section 1725.5. Subcontractors will be required to execute Flatiron’s Standard Subcontract Terms and Conditions and meet insurance requirements. A copy of our Standard Subcontract Terms and Conditions is available in electronic format upon request.

Bond Requirements: Notwithstanding any contrary language in a bid to Flatiron West, Inc. (“Flatiron”) or any prior course of dealing between Flatiron and a bidder, and unless waived in writing by Flatiron, Flatiron reserves the right, pursuant to Public Contract Code section 4108 and otherwise, to require each bidder to provide payment and performance bonds assuring bidder’s obligations to Flatiron in the amount of 100 percent of the bid to Flatiron. Flatiron will reimburse the bond premium at actual cost not to exceed 2%. The surety on the bonds must be a California admitted surety.

Flatiron is signatory to Operating Engineers, Laborers, Ironworkers, Cement Masons, Carpenters and Pile Drivers Union. Non-Signatory Subcontractors will be required to sign an agreement for trades covered under our Union Agreements.

Non-DBE Subs/Suppliers: Indicate 2nd tier DBE participation offered on your quotation as it will be evaluated with your price.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.