News & Events    Get Certified    Find My Next Contract
Welcome to DBE Journal, formerly Outreach Impact.


Outreach Coordinator

Estimating Department



Project Estimator

Thomas Smith



Contact Information

246 Ghilotti Ave
Santa Rosa, CA 95407



Telephone

(707) 585-1221 ext. 242



Fax

(707) 585-1601



Ghilotti Construction Company, Inc.
is seeking qualified Local & Small Local Richmond Businesses (LBE/SLBE)s


Project Name

13th & Dunn, And 23rd Street Sewer Rehabilitation Project



Bid/Contract #

None



Awarding Agency

Veolia Water West Operating Services, Inc.



Project Location

Richmond, Contra Costa County, CA



Bid Date

06/23/2017 at 11:00



Project Details

Ghilotti Construction Company, Inc. is seeking certified LBE/SLBE subcontractors, suppliers & truckers for the 13th & Dunn, And 23rd Street Sewer Rehabilitation Project in Richmond, CA. Quotes requested include, but are not limited to, the following scopes of work: TRAFFIC CONTROL, CAS, RESET-ADJUST ROADWAY ITEMS, COLD PLANE, ASPHALT PAVING, MINOR CONCRETE STRUCTURE, CONCRETE CURG & SIDEWALK-MISC., THERMOPLASTIC TRAFFIC STRIPING & PAVEMENT MARKINGS, PAINTED TRAFFIC STRIPING & PAVEMENT MARKINGS, EROSION CONTROL, STREET SWEEPING, MATERIAL SUPPLIER, STORM DRAIN (UNDERGROUND) AND TRUCKING. Engineer's Estimate: $10,170,000 / LBE Goal: 25% (10% SLBE) / 365 CD / $1,000 per day LD. Submit quotes by Noon on bid date. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage local business participation.



Mr. Thomas Smith (707/585-1221 or tom@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)

Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. Plans and Specifications will be available electronically to interested contractors by logging on to: www.blueprintexpress.com/veolia or by visiting, calling or emailing BPXpress Reprographics, 4903 Central Ave., Richmond, CA 94804, Phone: (510) 559-8299 / Fax: (510) 559-8398 / Email: Richmond@blueprintexpress.com. Plans may also be viewed or purchased through local plan rooms, builder’s exchanges, Dodge Scan or a GCC closer to your location. Ghilotti Construction Company encourages the use of local businesses and considers such to be an important aspect of the project.

Req: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC’s written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC’s website (www.ghilotti.com/subcontractors/documents) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.

Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form ‘CG-2010-1185’ or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.




Copyright © 2017, DBE GoodFaith, Inc. All rights reserved.