Mukilteo Ferry Terminal Phase 2 Trestle & Bridge Seat Construction
9118
WSDOT
Mukilteo, Snohomish County, WA
07/19/2017 at 11:00
DBE Goal 4%. Request for Certified DBE Subcontractors & Suppliers. Quotes requested for, but not limited to:, Aggregate Supply, Barge/Marine Rental, Clearing and Grubbing, Concrete Sawcutting, Concrete Supply, Concrete/Asphalt Sawcutting, Construction Area Signs, Crane Rental, Dive Pile, Diving, Electrical, Erosion Control, Fencing , Geotextile Filter Fabric, Hazardous Material Handling And Disposal, HMA/Asphalt Paving, Pipe Supply, Plumbing, Railing, Reinforcing Steel, Steel Pile Supply, Surveying, Traffic Control.
Plans and specifications can be downloaded, at no cost from WSDOT website at ftp://ftp.wsdot.wa.gov/contracts/9118-MukilteoFerryTerminalPhase2Trestle&BridgeSeatConstruction. Additionally, plans and specifications are available at Flatiron’s Renton, WA office. Please call to make an appointment to view plans and specifications. Quotations must be valid for same duration as specified by Owner for contract award. Assistance in obtaining bonding, lines of credit, insurance, equipment, supplies and materials is available upon request. Flatiron West, Inc. analyzes and considers each DBE quote, including those that are broken down into economically feasible units to facilitate bidding. Subcontractors will be required to execute Flatiron’s Standard Subcontract Terms and Conditions and insurance requirements. A copy of our Standard Subcontract Terms and Conditions is available in electronic format upon request. Bond Requirements: Notwithstanding any contrary language in a bid to Flatiron West, Inc. (“Flatiron”) or any prior course of dealing between Flatiron and a bidder, and unless waived in writing by Flatiron, Flatiron reserves the right to require each bidder to provide payment and performance bonds assuring bidder’s obligations to Flatiron in the amount of 100 percent of the bid to Flatiron. Flatiron will reimburse the bond premium at actual cost not to exceed 3%. Non-DBE Subs/Suppliers: Indicate 2nd tier DBE participation offered on your quotation as it will be evaluated with your price. We Are An Equal Opportunity Employer.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.