Jamie Stickney
2871 E Coronado St
Anaheim, CA 92806
(714) 632-3975
(714) 632-6724
Phase II Recycled Water Distribution System Expansion Project west Side System
N/A
El Toro Water District
Laguna Woods, Orange County, CA
07/26/2017 at 11:00
Concrete Work, Welding, Paving, Striping , Steel Pipe, Traffic Loops, Video Detection System, Aggregates, Trucking, Cathodic Protection, Temporary Fencing, Guard Posts, Metal Gates,
If we are awarded the project we would bond it and provide the insurance certificates. We require all subcontractors to provide their own insurance certificates as well. We will e-mail the plans 7 specifications to the subcontractor.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.