Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Dalia Nieto



Project Estimator

Lee Jones



Contact Information

250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949



Telephone

(415) 456-8972



Fax

(415) 459-0665



Thompson Builders Corporation
is seeking qualified Alameda County Transportation Commission LBE and SLBEs


Project Name

Warm Springs Bart West Access Bridge and Plaza Project



Bid/Contract #

City Project No PWC 8804



Awarding Agency

City of Fremont



Project Location

Fremont, Alameda County, CA



Bid Date

08/07/2017 at 2:00



Project Details

SCOPE: The Project is located on the east side of the intersection of Quantum Drive (formerly Lopes Court) and the future Innovation Way, and is described as follows: The project consists of the construction of a two-span (a truss span and a cable-stayed span) pedestrian and bicycle bridge connecting to the west side of the new Warm Springs / South Fremont BART station, the bridge vertical circulation elements (staircase, escalators with canopy, and elevator), installation of plumbing, lighting, security, and communications systems to support
the operation of the bridge. The project includes construction of various rooms, with required appurtenances, within the staircase and escalator buildings, including a Janitor/Storage Room, a Valve Room, a Communications Room, an Electrical Room, a Battery Room, an Elevator Machine Room, an Escalator Control Room, a Mechanical Space, and a Trash Area. The project also
includes construction of an approximately 1.0 acre City plaza that will provide a landing place for the bridge vertical circulation elements. The City plaza includes decorative pavement, seating elements (terraced seating, benches), lighting elements, stormwater treatment areas, landscaping, irrigation, utility connections, fences, bicycle lockers, solar charging stations, an information kiosk, a retaining wall and fence along the eastern edge of the project, and any other items or details
required by the contract documents. Some of the work associated with the West Access Bridge requires permitted access to BART property. Some of the work related to the West Access Bridge
will cross over UPRR right of way and will require permitted access to UPRR right of way. Some work associated with the West Access Bridge will be located under PG&E high voltage overhead
lines and must adhere to PG&E safety clearance requirements.

ESTIMATE: $18,000,000

GOALS: ACTC LBE 60% AND ACTC SLBE 20%

Seeking ACTC LBE and SLBE subcontractors/suppliers/truckers:
Division 02- Existing Conditions (Demolition; Selective Structure Demolition)
Division 03- Concrete (Concrete Restoration; Portland Cement Concrete; Concrete Forming; Falsework; Concrete Accessories; Waterstops; Elastomeric Bearing Pads; Concrete Reinforcing; Cast In Place Concrete; Concrete Finishing; Precast Concrete; Non-Shrink Grout)
Division 04- Masonry (Concrete Unit Masonry)
Division 05- Metals (Metal Welding; Structural Steel Framing; Stay Cable Assemblies; Metal Decking; Cold-Formed Metal Framing; Metal Fabrications; Metal Railings; Decorative Metal; Site Decorative Metal)
Division 06- Wood, Plastics, and Composites (Rough Carpentry)
Division 07- Thermal and Moisture Protection (Modified Bituminous Sheet Waterproofing; Building Insulation; Roof and Deck Insulation; Vapor Retarders; Metal Wall Panels; Modified Bitumen Roofing; Flashing and Sheet Metal; Cementitious Fireproofing; Firestopping; Joint Protection; Expansion Control)
Division 08- Openings (Metal Doors and Frames; Access Doors and Panels; Overhead Coiling Grilles; Aluminum –Framed Storefronts; Glazed Aluminum Canopy; Door Hardware; Glazing; Louvers)
Division 09- Finishes (Supports for Plaster and Gypsum Board; Gypsum Board; Tiling; Painting; Graffiti-Resistant Coatings)
Division 10- Specialties (Dimensional Letter Signage; Post and Panel Wayfinding System; Station Identification Pylons; Real-Time Display; Wire Mesh Barrier Screens; Safety Specialties; Directional Tactile Band; Station Signage and Graphics; Bird Control Devices)
Division 12 Furnishings (Furnishings; Site Furnishings)
Division 14 Conveying Equipment (Hydraulic Elevators; Escalators)
Division 20 Facility Services (Plumbing and HVAC Insulation; Common Materials and Methods for Facility Services- Fire Suppression, plumbing and HVAC; Pipe Sleeves, supports and anchors for facility services; Vibration Isolation and Seismic Control for Facility Services; Identification for Facility Services; Raceways for Facility Services; Underground Ductwork and Structures for Facility Services; Motors for Facility Services; Common Materials and Methods for Electronic Services; Indoor Cabinets, racks, frames and enclosures; Electronic circuits, wires and cables; Common Materials and Methods for Electrical Systems; Factory and Field Testing; Systems Integration Testing)
Division 21 Fire Suppression (Fire Suppression standpipe; Wet-Pipe Sprinkler System)
Division 22 Plumbing (Water Distribution; Sanitary Sewerage; Storm Drainage; Plumbing Fixtures)
Division 23 Heating, Ventilating, and Air Conditioning (HVAC) Testing, Adjusting and Balancing for HVAC; Instrumentation and Control for HVAC; Fan Control Panel; HVAC ducts and casings; HVAC Fans; Unitary HVAC Equipment)
Division 26 Electrical (Site Electrical General Provisions; Site Electrical Basic Material and Methods; Dry-Type Transformers; Low Voltage Wires and Cables; Grounding and Bonding for Electrical Systems; Supports, Seismic Protection and Sealants; Electrical Cabinets and Enclosures; Site Lighting Control System; Lighting Control System; Plaza Touch Interface Kiosks; Motor Starters and Contractors; Circuit Breakers and Panelboards; Power Bollard; Low Voltage Disconnects and Transfer Switches; DC Battery System; Uninterruptible Power Supply (UPS); Lighting; Site Lighting)
Division 27 Communications (General Provisions for Site Communications Systems; Grounding and Bonding for Site Communications Systems; Communication Cables and Related Equipment; Site Communications Copper Horizontal Cabling; Computer and Communication Subsystems; Telephone Systems; Public Address System; Supervisory Control and Data Acquisition System)
Division 28 Electronic Safety and Security (Access Control and Door Monitoring Systems; Fire Detection and Alarm System; Closed Circuit Television System)
Division 31 Earthwork (Earthwork; Clearing and Grubbing; Dewatering; Excavation Support and Protection; Driven Piles; Drilled Concrete Piers and Shafts)
Division 32 Exterior Improvements (Permeable Base Stone; Lime Treated Subgrade; Aggregate Subbase Courses; Aggregate Base Courses; Aggregate Drainage Layer; Decorative Concrete; Concrete Formliners; Bitumen-Set Concrete Pavers; Synthetic Turf; Synthetic Turf Nailer; Chain Link Fences and Gates; Vertical Grating Fence & Gates; Decorative Perforated Panels; Decorative Metal Fence; Plastic Fence; Irrigation System; Planting; Import Topsoil; Soil Preparation and Amendment; Hydroseeding)
Division 33 Utilities (Utility Structures; Support and Protection of Utilities; Trenching and Backfilling for Utilities; Water Utility Distribution Piping; Storm Drainage Utilities; Subdrainage; Underground Site Electrical Structures)



We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors faithful performance and payment bonds in the amount of the subcontract price may be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato Monday through Friday from 7:30 AM to 4:30 PM or can be e-mailed upon request. Or may be downloaded from: https://tpcorp.box.com/s/k4lt5nob7zyn34vupxb9nvfo9f55nmfk

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.