Jannette Carter
1400 Talbot Road South, Suite 500
Renton, WA 98055
(425) 420-9900 ext. 2009
(425) 420-9900
US 101 Coffee Creek Remove Fish Barrier Project (Design/Build)
9018
Washington State Department of Transportation
Shelton, WA , Mason County, WA
08/25/2017 at 11:00
DBE Goal – 9%
SUBCONTRACTOR/SUPPLIER QUOTES REQUESTED BY AUGUST 21, 2017
Request for quotes from certified DBEs for the following, but not limited to, scopes of work: Aggregate Supply, Bridge Deck Grinding, Chain Link Fencing, Drilled Shafts, Dumpsite, Electrical, Erosion Control, Exploratory Bores, Flatwork, Guardrail, Hydroseeding, Jack and Boring, Landscaping, Paving, Pre-cast Girders, Pre-Condition Survey, Rebar, Sawcutting, Slipform Barrier, Striping, Structure Demolition, Survey, Sweeping, Temporary Barrier, Temporary Bridge, Temporary Shoring, Traffic Control, Tree Removal, Trucking and Vac Truck.
RFP documents are available for download, at no cost, from WSDOT’s website at the following link: http://www.wsdot.wa.gov/biz/contaa/Contracts/Coffee.htm. Access to RFP documents is also available from Flatiron and additionally, RFP documents are available to view at our Renton, WA office. Please send an email request to WABids@flatironcorp.com to request access to the documents or to make an appointment to view the documents at our office.
Assistance in obtaining bonding, lines of credit, insurance, equipment, supplies and materials is available upon request. Flatiron analyzes and considers each DBE quote, including those that are broken down into economically feasible units to facilitate bidding. Quotations must be valid for same duration as specified by Owner for contract award.
Bond Requirements: Notwithstanding any contrary language in a bid to Flatiron or any prior course of dealing between Flatiron and a bidder, and unless waived in writing by Flatiron, Flatiron reserves the right to require each bidder to provide payment and performance bonds assuring bidder’s obligations to Flatiron in the amount of 100 percent of the bid to Flatiron. Flatiron will reimburse the bond premium at actual cost not to exceed 3%.
Non-DBE Subs/Suppliers: Indicate lower-tier DBE participation offered on your quotation as it will be evaluated with your price.
WE ARE AN EQUAL OPPORTUNITY EMPLOYER
#FLATIWI862D5
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.