Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Karin Romeo



Project Estimator

Erik Andresen



Contact Information

1141 Marina Way South
Richmond, CA 94804



Telephone

(510) 234-4200 ext. 26



Fax

(510) 234-4221



Alten Construction, Inc.
is seeking qualified DVBEs


Project Name

Sierra Vista K-8 New Multi-Purpose Building



Bid/Contract #

17-06



Awarding Agency

Vacaville Unified School District



Project Location

Vacaville, Solano County, CA



Bid Date

08/31/2017 at 2:00



Project Details

SCOPE: Construction of a new Multi-Purpose Building on an occupied K-8 school campus.
No PLA, but Prevailing Wage is Required / 5% Retention / See General Conditions Section 00 7000 Item 3.10 thru 3.15 for Insurance Requirements / Est. Start 9/25/17 – Complete 5/2018 / 309 day duration / MEP Subcontractors must be prequalified / 2 Year Warranty / RFI Due to bids@altenconstruction.com by 8/25/17

Subcontractors must be registered with the DIR to bid on this project https://www.dir.ca.gov/dlse/dlsePublicWorks.html
Note your DIR Reg. # & CA License # on your bid scope – it is the law to list these on bid day
Alten Construction may implement a CCIP (Contractor Controlled Insurance Program) on this or any Project
Subcontractors & Suppliers are required to comply with Alten’s standard subcontract(s) which can be found on our website www.altenconstruction.com

TRADES NEEDED (but not limited to): Demolition; Earthwork; Soil Treatment; Site Utilities; Disinfecting; Storm Drainage Utilities; Flexible Asphalt Paving; Site Concrete; Concrete; Concrete Unit Masonry; Structural Steel Framing; Steel Decking; Metal Fabrications; Rough Carpentry; Shop-Fabricated Structural Wood; Thermal Insulation; Coated Built-up Bituminous Roofing; Metal Roof Panels; Sheet Metal Flashing & Trim; Roof Accessories; Firestopping; Joint Sealants; Misc. Doors, Frames & Hardware; Access Doors & Panels; Coiling Counter Doors; Glazing; Louvers; Cement Plastering; Gypsum Board; Tiling; Acoustical Ceilings and Acoustical Room Components; Vapor Control for Flooring (Water Based); Resilient Flooring; Painting & Coating (CHPS); Misc. Signage; Plaques; Toilet Compartments; Wall Protection; Toilet/Bath/Laundry Accessories; Fire Protection; Metal Lockers; Food Service; AV Equipment; Projection Screens; Gym Equipment; In-Wall Tables; Vertical Wheelchair Lift; Fire Sprinklers; Plumbing; HVAC; Integrated Automation; Electrical; Communications; and Electronic Safety & Security.



Plans & Specifications are available for review and take-off in our office & free download on Procore.
Bid Coord: Karin Romeo x26 / Chief Estimator: Erik Andresen x15 / Estimator/Planroom: Jon Kidwell x33
Phone: 1-510-234-4200 Fax: 1-510-234-4221 (Dial 1 + Area Code) Email: bids@altenconstruction.com
In order for bids to be considered, they must be received at our office
by mail, phone or fax one half hour prior to bid closing time.

PREVAILING WAGE RATES, INSURANCE FORM CG2010 11/85 (EQUIVALENT IS CG2010 0704 & CG203 COMBINED) & WKLY CERTIFIED PAYROLL RPTS SUBMITTED ON LCP TRACKER ARE REQUIRED. 100% PERFORMANCE & PAYMENT BONDS MAY BE REQUIRED. ALTEN CONSTRUCTION WILL PAY UP TO 1.5% OF BOND PREMIUM.

ALTEN CONSTRUCTION, INC IS AN EQUAL OPPORTUNITY EMPLOYER
WE ARE SIGNATORY TO THE CARPENTER'S & LABORER'S UNIONS

NOTICE: BY SUBMITTING A BID, BIDDING SUBCONTRACTOR, SUPPLIER OR VENDOR AGREE, WARRANTS AND UNDERSTANDS THAT A) ALTEN IS RELYING ON THAT BID FOR ITS BID TO OWNER, AND THE BID MAY NOT BE WITHDRAWN AFTER BID OPENING; B) THAT BIDDER HAS REVIEWED THE PLANS AND SPECIFICATIONS, AND AS TO ITS SCOPE OF WORK, AGREES TO PERFORM ALL DUTIES INCLUDING INSURANCE AND INDEMNITY OBLIGATIONS, THAT ARE SPECIFIED BY OWNER AS ALTEN’S DUTIES, TO BIDDER’S DUTIES TO ALTEN; AND C) THAT UPON ALTEN’S AWARD OF THE PRIME CONTRACT SUBCONTRACTOR WILL DULY AND TIMELY EXECUTE ALTEN’S FORM SUBCONTRACT AS TO THE BID SCOPE OF WORK IN THE BID.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.