Patrick Snyder
Carter Masterson
3286 Fitzgerald Road
Rancho Cordova, CA 95742
(916) 287-9094
(916) 435-5236
Bull Lake Dam Spillway Modifications
R17PS00792
United States Bureau of Reclamation
Lenore, Fremont County, WY
09/29/2017 at 3:00
Malcolm International LLC is requesting quotes from all suppliers and qualified subcontractors for the following work scopes: Excavation (Subcontractor), Survey, Metal Fabrication, Shotcrete, Lead-based Paint Abatement, Concrete Supply, Concrete Pumping, Concrete Cutting, Joint Seal, Painting, Electrical, Earthwork, Dewatering, Embankments, Riprap, Soil Stabilization, Environmental Monitoring, Excavation & Fill, Concrete Barrier, Pipe Culverts, Erosion Control, Waterstop, Testing Laboratory Services, Soil Anchors, Subdrainage, Fencing, Temp Barrier, Reinforcing Steel (Subcontractor), Contaminated Soils Hauling and Disposal, Dust Control, Piezometers, Geotextile, Soil Nail Walls, Secant Pile Cutoff Walls, Piping, Pipe Culverts and Subdrainag
Plans and Specifications for the project are located on FBO.gov under solicitation number R17PS00792 or by copying and pasting the following web address in an internet browser https://www.fbo.gov/index?s=opportunity&mode=form&id=c05b38ca09f5dce2d300b723f6690ea1&tab=core&_cview=1
The proposal is due at 3pm MDT.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.