Jamie Stickney
Rory Campbell
2871 E Coronado St
Anaheim, CA 92806
(714) 238-6724
(714) 639-9792
Phase II Recycled Water Distribution System Expansion Project-East Side System
217207
El Toro Water District
Laguna Woods, Orange County, CA
10/12/2017 at 11:00
Concrete Flatwork, Concrete Slurry, Paving, Trucking, Surveying, Aggregates, Traffic Control
We will e-mail the plans and specs to any interested bidder.
We will bond the project and provide insurance certificates.
We Will require that all subcontractors provide their own insurance certificates as well.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.