Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Jason Muller



Contact Information

651 Enterprise Court
Livermore, CA 94550



Telephone

(925) 245-1300



Fax

(925) 245-1007



FBD Vanguard Construction, Inc.
is seeking qualified DBEs, MBEs, WBEs


Project Name

State Route 237 Express Lanes (Phase 2)



Bid/Contract #

C17122F



Awarding Agency

Santa Clara Valley Transportation Authority



Project Location

Various Locations, Santa Clara County, CA



Bid Date

10/05/2017 at 02:00



Project Details

FBD Vanguard Construction, Inc. is requesting quotes from all certified DBE subcontractors/suppliers/trucking firms for the following bid items including, but not limited to: Temp. Dewatering & Non-Stormwater Discharge Control System, Staking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Temp. Traffic Stripe, Channelizers, PCMS, Temp. K-Rail, Temp. Crash Cushion module, Temp. Alternative Crash Cushion, Prepare WPCP, Temp. Hydraulic Mulch, Temp. Drainage Inlet Protection, Temp. Fiber Roll, Street Sweeping, Soil Testing, Treated Wood Waste,Temp. High Visibility Fence, Rolled Erosion Control Product (Netting), Hydromulch, Fiber Roll, Hydroseed, Compost, Prime Coat, HMA, HMA Dike (Type E), Cold Plane AC Pavement, Cast-In-Drilled-Hole Concrete Pile, Sign Structures (Truss), Sign Panel and Frame, 12" & 18" Alternative Pipe Culvert, Misc. Iron & Steel, Chain Link Fence, Thermoplastic Striping, Pavement Markers/Striping, Roadside Signs, Laminated Panel Sign, Midwest Guardrail System, Single & Double Thrie Beam Barrier, Alternative In-Line Terminal System, Electrical, and Trucking.



A complete set of plans, specifications and any addenda that may be issued for this project are available for your review at our Livermore office or by visiting the following website:


http://www.vta.org/About-us/Procurement


We are an Equal Opportunity Employer. We seek and encourage bids from certified DBE, DVBE, MBE, SBE, UDBE, and WBE businesses. If your scope of work requires materials, please consider and list suppliers on you quote.

For all public projects Payment and Performance Bonds are required for 100% of the subcontract amount. Please contact FBD Vanguard Construction if you need any assistance in obtaining bonding, lines of credit or required insurance, equipment, supplies and/or materials.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.