Suzie Ransom
Brad Sanders
195 Concourse Blvd. Suite A
Santa Rosa, CA 95403
(707) 527-9968
(707) 527-0244
North Valley Wastewater Treatment Plant Improvements
DO-2017-156
Douglas County
Minden, Douglas County, NV
11/17/2017 at 02:00
K.G. Walters Construction is seeking qualified certified DBE subcontractors and suppliers for the North Valley Wastewater Treatment Plant Improvements Project located in Minden, NV. Quotes requested include but aren't limited to the following scopes of work: demolition, earthwork, ac paving, chainlink fencing and gates, rebar, masonry, cabinets, insulation, roofing, drywall, acoustical ceilings, flooring, painting, plumbing, HVAC, electrical and instrumentation, fire alarm, pond liner, aggregates, concrete forms, concrete pumping, CIP concrete, precast concrete, trucking, metal fabrications, portable restrooms, woods and plastics, roof specialties, HM doors, appliances, furnishings, diesel generator, slide gates, pumps, piping, valves, specialties. Standard payment terms are 95% progress payments, 5% retention unless other terms are provided for in prime contract and bonds are provided at no cost to contractor. Subcontractors, suppliers and vendors shall apply the same affirmative steps for DBE participation as required in the specifications to be responsive.
An Equal Opportunity Employer Require 100% payment and performance bonds. Premium up to 1.5% paid by contractor.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.