Anne OMalley
Warren Howard
470 Chestnut Ridge Rd
Woodcliff Lake, NJ 07677
(201) 571-2500 ext. 2530
(201) 571-2600
Design-Build of Electrical and Mechanical Rehabilitation at the RFK Bridge Harlem River Lift Span
RK-07
TBTA
New York City, New York County, NY
11/21/2017 at 02:00
Kiewit Infrastructure Co. is actively soliciting quotations for Materials, Contractors, Supplies and Services for the Project:
Project: Design-Build of Electrical and Mechanical Rehabilitation at the RFK Bridge Harlem River Lift Span
Contract: RK-07
Owner: TBTA
Description of Work: Design Build for Electrical and Mechanical Rehabilitations for the RFK Bridge.
Project Duration: 3 Years
Job site: RFK Bridge
The Project has a goal to obtain 15% WBE, 15% MBE, 6% SVDBE.
Please note that your access to the plan room is accessible using the orange link at the top of this email. Your email system may require you to download pictures in order to view the link. Please submit your detailed scope as soon as possible and final quotes at least two days prior to bid date.
Bid Opportunities Include:
Materials: Electrical Commodities, Precast Concrete Slab, Lighting, Traffic Gates
Supplies and Services: Dumpsters, Disposal Contaminated Soil, Fuel, MOT Supplies, Progress Photography, Office Supplies
Sub-Contracts
Asbestos Abatement, Concrete Cutting, Dehumidication, Deleading, Elevator Repair or Replacement, Ductbank, Generator, Misc Metals, Painting, Surveyors, Windows, General Contractor for Building Trades
Contact for this project:
Civil Estimator - Warren.Howard@kiewit.com
Electrical Estimator - NGetze@masselec.com
Plans & Specs: anne.omalley@kiewit.com
Drawings & Specifications
Contract documents, including plans & specifications are listed in our Online Plan room and are provided as a courtesy to the Bidder. The files can be viewed and downloaded. The Bidder will be required to quote in compliance with all project plans and specifications. Non-Disclosure Agreements are provided when applicable. Addenda is posted and a notification is sent to all invited bidders.
Insurance Requirements
Upon award, Subcontractors must provide insurance in accordance with our subcontract agreement. A copy of the subcontractor agreement can be found in SmartBidNet Project Plan Room.
Bonding Requirements
For subcontracts the Bidder shall furnish Performance and Payment Bonds equal to the full subcontract price. For Material Contracts, the Bidder shall furnish Supply Bonds in amount equal to full Material Contract price. Bond premiums are reimbursable by Kiewit/Mass. Electric Construction Co. Please provide current bond rate with Quote/Proposal or advise if you are unable to bond so that we my address this issue.
Submission of Proposals & Quotes
Proposals & Quotes from Contractors & Suppliers must be submitted at least 2 business days prior to bid due date. You can submit your quote three (3) ways:
1) Upload your proposal to SmartBidNet.com,
2) E-mail your quote/proposal to Project Estimator
Listed or anne.omalley@Kiewit.com
3) Fax your quote/proposal to our Estimating Dept.
at(201) 571-2600
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.