Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

SARAH MAUDLIN



Contact Information

250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949



Telephone

(415) 456-8972



Fax

(415) 459-0665



Thompson Builders Corporation
is seeking qualified DBEs


Project Name

Ohlone Greenway BART Station Area Access, Safety, and Placemaking Improvements



Bid/Contract #

Federal Aid Project No. CML-5239(025)



Awarding Agency

City of El Cerrito



Project Location

El Cerrito, Contra Costa County, CA



Bid Date

10/24/2017 at 02:00



Project Details

THOMPSON BUILDERS IS CURRENTLY SEEKING QUOTES AND PROPOSALS FROM ALL AND DBE CERTIFIED SUBCONTRACTORS, SUPPLIERS, AND TRUCKERS FOR THE FOLLOWING WORK INLCUDING BUT NOT LIMITED TO - MOBILIZATION; TRAFFIC CONTROL; LAYOUT AND STAKING; WATER POLLUTION CONTROL; CLEARING AND GRUBBING; REMOVE HANDRAIL; REMOVE FENCE; REMOVE AND SALVAGE BENCH; TREE REMOVAL; ASPHALT TRAIL REMOVAL; FULL DEPTH ASPHALT REMOVAL; REMOVE VEHICULAR CONCRETE; PAVEMENT MILLING; CONCRETE SIDEWALK REMOVAL; CURB AND GUTTER REMOVAL; RELOCATE IRRIGATION BOX & VALVE; RELOCATE BACKFLOW PREVENTER; REMOVE BART LIGHT, FOUNDATION & PULL BOX; RELOCATE CAMERA POLE AND FOUNDATION (HILL) ; RELOCATE BART STREETLIGHT (HILL STREET); RELOCATE ELECTRICAL BOX; REMOVE POST, SIGN, AND FOUNDATION; REMOVE CONCRETE VALLEY GUTTER; EXPORT SOIL; FINE GRADE LANDSCAPE AREA;AGGREGATE BASE – TRAIL; AGGREGATE BASE – ROADWAY; ASPHALT CONCRETE TRAIL; ASPHALT CONCRETE- ROADWAY; 2" ASPHALT OVERLAY;CONCRETE VALLEY GUTTER; CONCRETE CURB AND GUTTER; PEDESTRIAN RAMP;CONCRETE SIDEWALK; CONCRETE PLAZA; CONCRETE PLAZA COLORED; VEHICULAR CONCRETE; CONCRETE WALL AT CUTTING BLVD; GREENWAY SIGN WALL; CONCRETE WALL AT CENTRAL; CONCRETE WALL AT HILL STREET; DECOMPOSED GRANITE PAVING; SAFETY SURFACING; CONCRETE DRIVEWAY; CONCRETE VERTICAL CURB; COLORED CROSSWALK; HANDRAIL; ADJUST STORM DRAIN MANHOLE TO GRADE; ADJUST STORM DRAIN CATCH BASIN TO GRADE; 8" HDPE STORM DRAIN PIPE; MODIFY EXISTING CATCH BASIN; INSTALL NEW TYPE G CURB INLET; CONVERT STORM DRAIN INLET TO MANHOLE LID; CUTTING BLVD: IRWL/RRFB SYSTEM MODIFICATION; HILL STREET: NEW IRWL/RRFB SYSTEM; CENTRAL AVE: IRWL/RRFB SYSTEM MODIFICATION; FAIRMOUNT AVE: NEW IRWL/RRFB SYSTEM; ELECTRICAL CONDUIT AND CONDUCTORS; PEDESTRIAN AREA LIGHT; ELECTRICAL PULL BOX; DETAIL A24F: THERMOPLASTIC CONTINENTAL STRIPE; DETAIL 22: THERMOPLASTIC DOUBLE YELLOW SOLID LINE; DETAIL 24E: THERMOPLASTIC LIMIT LINE; DETAIL 8: THERMOPLASTIC DASHED LINE; DETAIL 27B: THERMOPLASTIC SOLID STRIPE; 12" WHITE THERMOPLASTIC STOP BAR; PAINT 12" WHITE STOP BAR; PAINT 4" YELLOW CENTERLINE STRIPE – TRAIL; PAINT 4" YELLOW SOLID STRIPE; THERMOPLASTIC BIKE LANE SHARROW WITH ARROW; DETAIL A24C: SHARED ROADWAY BICYCLE MARKING; BIKE LANE ARROW SOLID – CROSSWALK; BIKE LANE SYMBOL WITH PERSON – CROSSWALK; THERMOPLASTIC PEDESTRIAN MARKER – CROSSWALK; THERMOPLASTIC PAVEMENT LEGENDS’ THERMOPLASTIC YIELD LINE;REGULATORY SIGN, POST AND FOUNDATION; CUSTOM SIGN, POST AND FOUNDATION; POST AND FOUNDATION WITH MULTIPLE SIGNS; WAYFINDING SIGN; MULTI USE TRAIL SIGN; PAINT RED CURB; POLE FOOTING; METAL HEADER; LANDSCAPE MAINTENANCE ( 1 YEAR); PLAY STRUCTURE; BENCH #1 (STRAIGHT 4'); BENCH #2 (CURVED); BIKE REPAIR STATION; TRASH/ RECYCLING RECEPTACLE; SOLAR BRICK; TREE GRATE; 24” BOX TREE; SHRUB 1 GALLON; SHRUB 5 GALLON; COMPOST (25,500SF); IMPORTED TOPSOIL BERM; SHEET MULCH CARDBOARD; RECYCLED MULCH (24,539SF 3”); ROCK MULCH (1089SF 3”); BOULDER; LOG PLACEMENT; ROOT BARRIER; IRRIGATION SYSTEM



We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors faithful performance and payment bonds in the amount of the subcontract price may be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato Monday through Friday from 7:30 AM to 4:30 PM or can be e-mailed upon request.

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.