Fred
Fred Heidarian
7100 Hayvenhurst Ave Suite PH-A2
Van Nuys, CA 91406
(818) 308-6435
(818) 308-6202
South Waterfront/Pier J Bike & Pedestrian Path
HD-S2467
Port of Long Beach
Long Beach, LOS ANGELES County, CA
10/31/2017 at 2:00
The work includes but is not limited to the following: Construct pedestrian and bike paths along Queensway Drive from Queens Highway bridge to Harry Bridges Park, including asphalt concrete pavement, concrete curb and gutter, retaining walls, landscaping & irrigation, tree removal, striping and traffic control.
We are an equal opportunity employer. The plans and specs are available for your review at our office. Bonds will not be required from qualified subcontractors.
We can email the plans and specs upon request.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.