Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Dalia Nieto



Project Estimator

Lee Jones



Contact Information

250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949



Telephone

(415) 456-8972



Fax

(415) 459-0665



Thompson Builders Corporation
is seeking qualified DVBEs


Project Name

Walters Junior High School - New Buildings Project



Bid/Contract #

#229-10-20-17



Awarding Agency

FREMONT UNIFIED SCHOOL DISTRICT



Project Location

FREMONT , Alameda County, CA



Bid Date

11/17/2017 at 2:00



Project Details

The Project consists of:
Selective demolition of hardscape and construction of (2) two-story classroom structures and (1) one-story classroom structure, including associated civil, site improvements, architectural, structural, plumbing, mechanical, electrical,
landscaping, fire protection, elevators, and restrooms as indicated in the Drawings and Specifications. Generally, these categories of work involve new finishes, adaptive re-use and modification of certain selected areas, new cabinetry, handicap
accessibility, and roofing. The Project will involve the barricading of work areas.

Estimate: $16,000,000

Goal: DVBE 3%

Division 02 – Existing Conditions (Subsurface Investigation and Selective Demolition)
Division 03- Concrete (Concrete forming; Concrete Reinforcing; Cast-In-Place Concrete; Vapor Emission Treatment; Concrete Finishing; Integrally Colored Concrete)
Division 05 – Metals (Structural Steel Framing; Metal Decking; Structural Metal Stud Framing; Metal Fabrications; Metal Stairs and Railings)
Division 06- Wood, Plastics and Composites (Rough Carpentry; Glued Laminated Construction; Plastic Laminate Clad Architectural Cabinets)
Division 07 – Thermal and Moisture Protection (Sheet Waterproofing; Crystalline Waterproofing; Building Insulation; Below Grade Vapor Barriers; Metal Roof Panels; Arch Metal Deck Design Calculations; Single Ply Roofing System; Sheet Metal Flashing and Trim; Flexible Flashing; Roof Hatch and Ladder; Firestopping; Joint Sealants)
Division 08 – Openings (Metal Doors and Frames; Flush Wood doors; Access Doors and Frames; Overhead Coiling Doors; Aluminum Sun Shades; Aluminum Windows; Tubular Daylighting Devise; Door Hardware; Glass Glazing; Louvers and Vents)
Division 09 – Finishes (Non-Structural Metal Framing; Acrylic Modified Portland Cement Plastering; Gypsum Board; Tiling; Suspended Acoustical Ceilings 09 60 00 Resilient Sheet Flooring; Resilient Flooring; Seamless Epoxy Flooring; Vinyl Covered Tackable Wall Panels; Acoustic Treatment; Painting and Coating)
Division 10- Specialties (Visual Display Surfaces; Signage; Toilet Partitions; Toilet Accessories; Fire Extinguishers and Cabinets; Assistive Listening Devices)
Division 11 – Equipment (Projection Screens)
Division 12 - Furnishings (Horizontal Louver Blinds; Plastic Countertops)
Division 14 – Conveying Equipment (Hydraulic Passenger Elevator)
Division 21 – Fire Suppression (Water based Fire Suppression Systems; Wet Pipe Fire Sprinkler System)
Division 22 – Plumbing (Plumbing; Commissioning of Plumbing)
Division 23 – Heating, Ventilating, Air Conditioning (HVAC) (General Mechanical Requirements; Commissioning of HVAC; Heating, Ventilating, Air Conditioning; Split System Air Conditioning)
Division 25 – Integrated Automation (Instrumentation and Control for HVAC)
Division 26 – Electrical (Basic Electrical Requirements; Basic Electrical Materials and Methods; Electrical Identification; Grounding and Bonding; Electrical Hangers and Supports; Electrical Supports and Seismic Restraints; Commissioning of Electrical Systems; Lighting Control Devices; Modular Dimming Control; Addressable-Luminaire Lighting Controls; Raceways and Boxes; Conductors and Cables; Wiring Devices; Panelboards; Overcurrent Protective Devices; Enclosed Switches and Circuit Breakers; LED Interior Lighting; Emergency and Exit Lighting; LED Exterior Lighting; Special Systems; Transient Surge Suppressors)
Division 27 – (Technology Network Installation and Documentation; Test and Acceptance Requirements; Common Work Results for Communications; Grounding and Bonding for Communications Systems; Hangars and Supports for Communication Systems; Conduits and Backboxes for Communication Systems; Surface Raceways for Communication Systems; Underground Ducts & Raceways for Communications; Noise and Vibration for Communication Systems; Identification for Communication Systems; Structured Cabling, Basic Materials and Methods, Communications Entrance Protection, Communications Cabinets, Racks, Frames and Enclosures; Communications Termination Blocks and Patches; Communication Cable Management; Communications Indoor Backbone Cabling; Communications Outside Plant Backbone Cabling; Communications Horizontal Cabling; Public Address & Intercommunication Systems; Clock and Program Systems; Attachment to Clock Program Systems; LAN Systems Classroom; Small-Medium Offices; Wireless Local Area Networks (WLANS))
Division 28 – Electronic Safety and Security (Fire Alarm System)
Division 31 – Earthwork (Site Clearing; Earth Moving; Trenching and Backfiling; Drilled concrete Piers and Shafts)
Division 32 – Exterior Improvements (Aggregate Base Course; Asphalt Paving; Concrete Paving; Chain Link Fences and Gates; Ornamental Picket Fence; Irrigation; Landscape)
Division 33 – Utilities (Water Utility Distribution piping; Sewage Utilities; Storm Utility Drainage Piping)

Please submit bids to us by noon on bid day.



We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato Monday through Friday from 7:30 AM to 4:30 PM or can be e-mailed upon request. Plans and specs may be downloaded from the link:
https://tpcorp.box.com/s/adyeyswfvna9uyj5327aoopktrekq7b5

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.