Heidi Faria
Jean Sicard
1520 Fourth Street
Berkeley, CA 94710
(510) 526-3424 ext. 3446
(510) 526-0990
Richmond-San Rafael Bridge Access Improvement Project Package B-1
BATA-014
Bay Area Toll Authority
Richmond - San Rafael, Contra Costa - Marin County, CA
11/29/2017 at 2:00
Trucking, Lead Compliance Plan, Construction Area Signs, Traffic Control
System, Type III Barricade, Portable Changeable Message Sign, SWPPP, Rain
Event Action Plan, Storm Water Sampling & Analysis, Sweeping, Health &
Safety Plan, Treated Wood Waste, Public Safety Plan, Adjust Utilities to Grade,
Cold Plane AC, Polyester Concrete Overlay, Clearing & Grubbing, Develop
Water Supply, Roadway Excavation (Type Z-2 Aerially Deposited Lead), Rock
Blanket, Soil Amendment, Planting & Irrigation, Imported Topsoil, Hydroseed,
Erosion Control, AC Dike, Tack Coat, Grinding, Minor Concrete, Drill and
Bond Dowel, Clean Expansion Joint, Roadside Signs, Underground,
Construction Survey, Misc. Iron & Steel, Misc. Metal Bridge,
Fencing, Midwest Guardrail System, Concrete Barrier, Crash
Cushion, Striping & Marking, Electrical and Construction Materials
An Equal Opportunity Employer
100% Performance & Payment Bonds may be required. Worker’s Compensation
Waiver of Subrogation required. Please call OCJ for assistance with bonding,
insurance, necessary equipment, material and/or supplies. OCJ is willing
to breakout any portion of work to encourage SBE Participation. Plans &
Specs are available for viewing at our office.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.