Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

MERVIN LORICO



Project Estimator

FERNANDO MARQUEZ



Contact Information

8051 MAIN STREET
STANTON, CA 90680



Telephone

(714) 828-4882 ext. 3



Fax

(714) 503-6805



USS CAL BUILDERS INC.
is seeking qualified MBEs, WBEs, SBEs


Project Name

CHERRYLAND COMMUNITY CENTER



Bid/Contract #

13023



Awarding Agency

ALAMEDA COUNTY



Project Location

HAYWARD, ALAMEDA County, CA



Bid Date

12/07/2017 at 14:00



Project Details

USS Cal Builders is seeking qualified 60% LBE, 40% SLBE, 15% MBE, 5% WBE subcontractors, suppliers and firms to meet or exceed the goal for this project.

Engineer’s Estimate: $15 Million

The Work includes, but is not limited to: Asbestos Abatement and Hazardous Materials, Concrete, Masonry, Structural Steel and Metal Fabrications, Rough Carpentry, Casework, Roofing, Doors and Hardware, Glazing, Framing and Drywall, Plastering, Floor Finishes, Tiling, Painting, Acoustical Ceilings, Fire Suppression System, Plumbing, HVAC, Electrical, Communications, Electrical Safety and Security, Fire Alarm, Earthwork, Asphalt Paving, Site Utilities, Landscape and Irrigation, Signages, Food Service Equipment.
For detailed line items, please go to:
http://share.bidmail.com/quickplans/quickplans.aspx?cmd=MjA3NDI0MTQ0Ni4wNTI2Mzg3LTE4NDYxNS00ODc5MS0wMDAwMDIzODg3LTUyMTk1LjMwMzM2MzI2Li4=.



If requested, USS Cal Builders can assist subs in obtaining bonds, lines of credit and insurance in the preparation of this project. USS Cal can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. USS Cal is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications and addenda regardless of any qualifying language in the proposal. USS Cal's listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.

Each listed subcontractor must execute USS Cal's standard subcontract agreement if USS Cal is awarded the project; the standard subcontract is available for review on USS Cal's website (www.usscalbuilders.com ) and at USS Cal's office. At the discretion of USS Cal, any listed subcontractor that withdraws its bid after USS Cal submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor.

This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement. USS Cal Builders, Inc. is signatory to the Carpenter's Union. Any subcontractor performing carpentry work must be signatory to the Carpenter's Union.

An Equal Opportunity Employer.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.