Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Dalia Nieto



Contact Information

250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949



Telephone

(415) 456-8972



Fax

(415) 459-0665



Thompson Builders Corporation
is seeking qualified DVBEss


Project Name

El Centro Elementary School Modernization and New Construction, Increment 1 for the El Centro/Salvador Consolidation Measure H Project



Bid/Contract #

SPC 23.65-16



Awarding Agency

Napa Valley Unified School District



Project Location

Napa, Napa County, CA



Bid Date

12/01/2017 at 01:30



Project Details

Estimate $13,500,000 - $15,000,000

Goal: 3% DVBE

Scope: Modernization and New Construction.

Seeking DVBE subcontractors/suppliers and truckers. Trades Needed (but not limited to):
Division 02 Existing Conditions (Building Demolition; Minor Demolition for Remodeling)
Division 03 Concrete (Concrete Forming and Accessories; Concrete Reinforcing; Cast-In-Place Concrete; Concrete Floor Finishing)
Division 04 Masonry (Concrete Unit Masonry)
Division 05 Metals (Structural Steel Framing; Metal Decking; Metal Fabrications; Access Ladders)
Division 06 Wood, Plastics and Composites (Rough Carpentry; Glued Laminated Construction; Finish Carpentry; Architectural Wood Casework)
Division 07 Thermal and Moisture Protection (Roofing Repair; Board and Batt (Building) Insulation; Weather Barriers; Water Vapor Emission Control Coating; Metal Roof Panels; Modified Bituminous Membrane Roofing; Sheet Metal Flashing and Trim; Roof Specialties; Roof Accessories; Firestopping; Joint Sealers)
Division 08 Openings (Hollow Metal Doors and Frames; Access Doors and Panels; Overhead Coiling Doors; Aluminum Entrances and Storefronts; Aluminum Windows; Door Hardware, Door Hardware Cut Sheets; Glazing; Louvers)
Division 09 Finishes (Concrete Floor Preparation; Concrete Floor Moisture Content and pH testing; Gypsum Board Assemblies; Acrylic Modified Portland Cement Plaster; Tiling; (Suspended) Acoustical Ceilings; Direct-Applied Acoustical Ceilings; Resilient Flooring; Fluid Applied Flooring; Tile Carpeting; Wall Panels; Wood Fiber Acoustical Wall Panels; Exterior Painting; Interior Painting)
Division 10 Specialties (Visual Display Boards; Signage; Reinforced Composite Toilet Compartments; Toilet Accessories; Fire Protection Specialties; Lockers)
Division 11 Equipment (Facility Fall Protection; Food Service Equipment Food Service Cut Sheets; Audio Visual Equipment; (Stage) Draperies & Tracks)
Division 12 Furnishings (Window Shade Systems; Vertical Louver Blinds; Countertops; Site Furnishings)
Division 14 Conveying Equipment (Wheelchair Lifts)
Division 21 Fire Suppression (Fire Protection Fire Protection Cutsheets)
Division 22 Plumbing (Plumbing Cut Sheets)
Division 23 Heating Ventilating and Air Conditioning (HVAC) (Heating, Ventilating, Air Conditioning; General Mechanical; Testing Adjust, and Balancing for HVAC; Energy Management System for HVAC)
Division 26 Electrical (Basic Electrical Requirements; Testing; Service and Distribution System; Basic Electrical Materials and Methods; Lighting Lighting Cut Sheets; Site Lighting; Low Voltage Lighting Control System)
Division 27 Communications (Voice and Data Communication System; Classroom Audio-Video System; Assisted Listening System)
Division 28 Electronic Safety and Security (Fire Alarm System Voice EVAC Fire Alarm Equipment List)
Division 31 Earthwork (Earthwork; Site Clearing; Finish Grading)
Division 32 Exterior Improvements (Off Site Development; Pavement Repair; Aggregate Base Course; Asphalt Concrete Paving; Site Concrete; Permeable Interlocing Concrete Pavement; Pavement Marking; Chain Link Fences and Gates; Ornamental Steel Fences and Gates; Sliding Gates; Double Heavy Duty Swing Gates; Irrigation System; Landscape Planting)
Division 33 Utilities (Site Utilities; Water Systems; Site Fire Water; Sanitary Sewer; Storm Drainage



We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato Monday through Friday from 7:30 AM to 4:30 PM or can be e-mailed upon request. Link to plans and specs:
https://tpcorp.box.com/s/gyl7i98ed92vrj646b9qrie3pfwjanpb

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.