Heidi Faria
Greg Souder
1520 Fourth Street
Berkeley, CA 94710
(510) 526-3424 ext. 3446
(510) 526-0990
Pavement rehabilitation and ramp metering Hwy 680 Fremont
Caltrans #04-3G6034
Caltrans
Fremont, Alameda County, CA
01/10/2018 at 02:00
Trucking, Progress Schedule, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, SWPPP, Rain Event Action Plan, Storm Water Sampling & Analysis, Sweeping, Treated Wood Waste, Clearing & Grubbing, Temporary Erosion Control
Measures, Roadway Excavation, Structure Excavation, Structure Backfill, Pervious Backfill Material, Imported Borrow, Cement Treated Base, Rapid Set LCP, Lean Concrete Base, Crack and Seat, Crack Treatment, Geosynthetic Pavement Interlayer, AC Dike, Tack Coat, Cold Plane AC, Precast Jointed Concrete Pavement, Individual Slab Replacement, Furnish & Drive Pile, Concrete Gutter Lining, CIDH Pile, Structural Concrete, Minor Concrete,
Paving Notch Extension, Fractured Rib Texture, Clean Expansion Joint, Joint Seal, Bar Reinforcing Steel, Sign Structure, Underground, Adjust Utilities, Culvert Slurry-Cement Backfill, Rock Slope Protection, Misc. Iron & Steel,
Pavement Marker, Barrier Marker, Object Marker, Roadside Signs, Midwest Guardrail System, Vegetation Control (Minor Concrete), Temp K-Rail and Crash Cushion, Concrete Barrier Type 60s & 736s, Striping & Marking, Rumble Strip, Electrical, and Construction Materials
An Equal Opportunity Employer
100% Performance & Payment Bonds may be required. Worker’s Compensation
Waiver of Subrogation required. Please call OCJ for assistance with bonding,
insurance, necessary equipment, material and/or supplies. OCJ is willing
to breakout any portion of work to encourage DBE Participation. Plans &
Specs are available for viewing at our office or through the Caltrans Website at www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.