Kevin Bechtel
555 Du Bois Street
San Rafael, CA 94901
(415) 459-8640
(415) 459-2065
2017 Slide Repair Project
2017-22
Marin County Department of Public Works
3 Locations: San Rafael, Fairfax, and Marshall , Marin County, CA
12/04/2017 at 11:00
for the following, but not limited to, items of work:
SUPPLY AC, CL2 AB, PERMEABLE ROCK; CIDH, STRUCTURE, AND MINOR CONCRETE; FILTER FABRIC; LUMBER; MISC IRON; SUBDRAIN PIPE; STEEL BEAMS; PRECAST CONCRETE LAGGING; AND RCP.
SUBCONTRACTOR FOR DRILLING; CIDH; CONCRETE PUMPING; CONCRETE REINFORCING; TIEBACK ANCHORS; COATING OF STEEL BEAMS; EROSION CONTROL; CABLE RAIL FENCE; WOOD FENCE; PAVEMENT STRIPING AND MARKERS; PAVEMENT GRINDING; AND WELDING. PROVIDE SWPPP/WPCP AND QSP SERVICES; AND TRUCKING OF MATERIALS.
Plans, specifications, and other project information can be viewed at our office in San Rafael; at the Count of Marin Department of Public Works located at Room 404, Civic Center, San Rafael, CA; and at local Building Exchanges. rnMaggiora & Ghilotti is an equal opportunity employer and will consider all bids and is willing to break down items, as reasonably possible, into economically feasible units to facilitate DBE participation.rnMaggiora & Ghilotti, Inc. is a union signatory company. Performance and payment bonds may be required. Maggiora & Ghilotti will pay for bond premium up to 1.5%. Subcontractors must be registered with DIR and have a current contractor’s license, insurance and worker’s compensation coverage meeting project requirements. Contact us if you are interested in bidding on this work, or with any questions regarding project requirements, scope of work, or if you need assistance in obtaining bonds, line of credit, and/or insurance for this project.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.