Jason Muller
651 Enterprise Court
Livermore, CA 94550
(925) 245-1300
(925) 245-1007
Install Concrete Barrier to Replace Existing MBGR and Bridge Railing
07-291704
Caltrans
Long Beach, Los Angeles County, CA
12/21/2017 at 02:00
FBD Vanguard Construction, Inc. is requesting quotes from all qualified DBE & Non-DBE firms for the following items of work including, but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Temporary Traffic Strip & Pavement Markers, Channelizer. Temporary K-Rail, Temporary Crash Cushions, Prepare WPCP, Temporary Fiber Roll, Remove Yellow Thermoplastic Traffic Stripe (Haz. Waste), Treated Wood Waste, Place Hot Mix Asphalt Dike (Type F), Structural Concrete Bridge (Polymer Fiber), Joint Seal, Rebar, Bridge Removal, Carbon Fiber Reinforced Polymer Strip, Guardrail Delineators, Remove Roadside Signs, Furnish Single Sheet Aluminum Signs (0.063? Framed & Unframed), Retroreflective Sheeting, Metal (Barrier Mounted Sign), Midwest Guardrail System, Transition Railing, Striping & Markings, Electrical, and Trucking.
A complete set of plans, specifications and any addenda that may be issued for this project are available for your review at our Livermore office or by visiting the following website:
http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php
We are an Equal Opportunity Employer. We seek and encourage bids from certified DBE, DVBE, MBE, SBE, UDBE and WBE businesses. If your scope of work requires materials, please consider and list suppliers on you quote.
For all public projects Payment and Performance Bonds are required for 100% of the subcontract amount. Please contact FBD Vanguard Construction should you need assistance in obtaining bonding, lines of credit or required insurance, equipment, supplies and or materials
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.