Welcome to DBE Journal, formerly Outreach Impact.
Find Subcontract Opportunities

Outreach Coordinator

Suzie Ransom

Project Estimator

Brad Sanders

Contact Information

195 Concourse Blvd. Suite A
Santa Rosa, CA 95403


(707) 527-9968


(707) 527-0244

K. G. Walters Construction Co., Inc.
is seeking qualified DBEs, MBEs, WBEs, SBEss

Project Name

Mariposa Wastewater Treatment Facility Improvements

Bid/Contract #

Mariposa 1-18-18

Awarding Agency

Mariposa Public Utility District

Project Location

Mariposa, Mariposa County, CA

Bid Date

01/18/2018 at 02:00

Project Details

K.G. Walters Construction is seeking qualified certified DBE subcontractors and suppliers for the Mariposa Public Utility District Wastewater Treatment Facility Improvements Project located in Mariposa, CA. Quotes requested include but aren't limited to the following scopes of work: revegetation, surveying, demolition, earthwork, shotcrete, ac paving. rebar, masonry, insulation, roofing, overhead doors, windows, painting, laboratory casework, pre engineered building, HVAC, electrical and instrumentation, blasting, fences, bolted steel tank, aggregates, erosion control, concrete formwork, readymix concrete, concrete pumping, precast concrete, trucking, lumber, miscellaneous metals, portable restrooms, doors, building materials, pumps, piping, valves, specialties, generator, plant equipment. Standard payment terms are 95% progress
payments, 5% retention unless other terms are provided for in prime contract and bonds are
provided at no cost to contractor. Subcontractors, suppliers and vendors shall apply the same
affirmative steps for DBE participation as required in the specifications to be responsive.

An Equal Opportunity Employer Require 100% payment and performance bonds. Premium up to 1.5% paid by contractor.

Copyright © 2018, DBE GoodFaith, Inc. All rights reserved.