Annette Conley
Jim Petnic
246 Ghilotti Ave
Santa Rosa, CA 95407
(707) 585-1221 ext. 242
(707) 585-1601
Bon Air Road Bridge Replacement
Federal-Aid Project No. BHLS 5166(015)
City of Larkspur
Larkspur, Marin County, CA
01/30/2018 at 02:00
Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors, suppliers & truckers for the Bon Air Road Bridge Replacement Project in the City of Larkspur (Federal-Aid Project No. BHLS 5166(015). Quotes requested include, but are not limited to, the following scopes of work: CONSTRUCTION AREA SIGNS, ROADSIDE SIGNS, TRAFFIC CONTROL SYSTEM, LIGHTING, DEMOLITION/BRIDGE REMOVAL, CLEAR & GRUB, LANDSCAPE / HIGHWAY PLANTING, ASPHALT PAVING, SLURRY SEAL, CAST-IN-DRILLED-HOLE PILING, CONCRETE PUMP STATION & VAULT, PUMPING PLANT ELECTRICAL EQUIPMENT, CONCRETE CURB & SIDEWALK – MISC., STRUCTURAL CONCRETE, EROSION CONTROL, IRRIGATION, REINFORCING STEEL, METAL RAILING, THERMOPLASTIC STRIPING & PAVEMENT MARKINGS, SURVEYOR, STREET SWEEPING, MATERIAL SUPPLIER & TRUCKING. Engineer's Estimate: $25,807,000 / DBE Goal: 10% / 1,491 CD / $8,300 per day LD. Submit quotes by Noon on bid date. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.
Mr. Jim Petnic (707/585-1221 or jimp@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.) rnrnPlans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also be downloaded through www.Ebidboard at http://bit.ly/LarkspurBidDocs. Plans may also be viewed or purchased through local plan rooms, builder’s exchanges, or Dodge Scan. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project. rn rnReq: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC’s written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC’s website (www.ghilotti.com/subcontractors/documents) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void. rnrnInsurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form ‘CG-2010-1185’ or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.rn
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.