Ameer Omary
Matt Roth
3650 Cincinnati Avenue
Rocklin, CA 95765
(916) 253-9373 ext. 16
(916) 253-9377
Sutter Middle School - HVAC Replacement
N/A
Sacramento City Unified School District
Sacramento, Sacramento County County, CA
01/30/2018 at 04:30
Work of the project includes HVAC equipment, direct digital controls (DDC) and LED lighting. Other items involve removing the existing classroom unit ventilators and replacing with furnace units and fabric ductwork; removing and replacing the existing roofing system below the existing mechanical support frame and chase; removing and replacing the existing rooftop condensing units; adding economizers to the units at the portable buildings; removing the existing boiler units; retrofitting the existing lighting fixtures for Prop 39; removing and replacing the existing kitchen fume hood; CMU crack repair/rehabilitation; and other work as shown in the documents as required for a complete and operational project.
Project documents can be obtained from the following:
The plans and specifications may be obtained in e-Builder at https://bidders.e-builder.net/landing?bidpackageid=b2e9dcab-11a8-4d69-a419-dc2db34d820a
or by calling the Architect at (916) 368-7990.
Plans Specs & Addenda can also be obtained from the builders exchange. www.calbx.com
The Project shall be governed by a Project Labor Agreement ("PLA"). The successful Contractor
(and all Subcontractors) will be required to execute an "Agreement to be Bound", whereby
Contractor and Subcontractors agree to conform to all terms and conditions set forth in the PLA.
The full text of the PLA is available on the District's website.
Hopefully you can get us covered, they are anxious to make this happen.
Please fax your quotes to us at (916) 253-9377.
We look forward to receiving your bids!
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.