Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Estimating Department



Project Estimator

Thomas Smith



Contact Information

246 Ghilotti Ave
Santa Rosa, CA 95407



Telephone

(707) 585-1221 ext. 242



Fax

(707) 585-1601



Ghilotti Construction Company, Inc.
is seeking qualified DBEs, MBEs, WBEs, SBEss


Project Name

Recycled Water Dsitribution System - Winton Avenue to Eden Park Place



Bid/Contract #

07507



Awarding Agency

City of Hayward



Project Location

Hayward, Alameda County, CA



Bid Date

02/15/2018 at 02:00



Project Details

Seeking certified MBE/WBE/DBE/SBE/SBRA/LSAF/HUB Subcontractors, Suppliers & Truckers for construction on the Recycled Water Distribution System Winton Avenue to Eden Park Place (Project No. 07507). The work involves installing approximately 7.6 miles of recycled water pipelines between 6-inch and 12-inch in diameter complete with valves, fittings, service connections, meter boxes, and other appurtenances as indicated on the Contract Drawings. Quotes requested include, but are not limited to, the following scopes of work: FABRIC & OILS, CAS, TRAFFIC COTNROL, RESET-ADJUST ROADWAY ITEMS, COLD PLANE AC, SLURRY SEAL, MINOR CONCRETE STRUCTURE, JACKED WELDED STEEL PIPE, EROSION CONTROL, STREET SWEEPING, MATERIAL SUPPLIER & TRUCKING. Engineer's Estimate: $16,671,000 / MINORITY GROUPS: MBE/WBE/DBE/ SBE/SBRA/LSAF/HUB / 420 WD / $1,000 per day LD. Submit quotes by Noon on bid date. GCC is available to discuss breaking out any portion of work to encourage minority participation.



Mr. Thomas Smith (707/585-1221 or tom@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: G.C.C. may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. G.C.C. is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)

Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They can also be accessed and downloaded for free through the City of Hayward's website: https://www.hayward-ca.gov/business/doing-business-with-hayward/bidding-construction. Contact the City of Hayward at (510) 583-4700 to purchase hard copies of the project documents for $100 (if picked up) or $125 if mailed by USPS. They may also be reviewed at the various builders exchanges and construction service offices throughout the San Francisco Bay Area.

Req: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC's written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC's website (www.ghilotti.com/subcontractors/documents) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.

Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form 'CG-2010-1185' or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.