Sharon Scott
Mark Eberhart
20 Stokes Dr
Mound House, NV 89706
(775) 246-1900
(775) 246-1986
WATER METER INSTALLATION PROJECT - PHASE 4
--
SOUTH TAHOE PUBLIC UTILITY DISTRICT
SOUTH LAKE TAHOE, EL DORADO County, CA
03/06/2018 at 14:00
This project is located in South Lake Tahoe, California. It is the installation of up to 1461 residential water meters, etc.
MKD Construction is actively requesting quotes for the following:
SUBCONTRACTORS: Plumbers & Pipe Fitters; Revegetation; Asphalt Patch Paving; Landscaping; Trucking - Water Truck; Traffic Control; Critical Path Scheduler; Vacuum Excavation
SUPPLIERS: Asphalt; Aggregate; Pipe & Meter Boxes and Appurtenances; Erosion BMP's and Safety/Shoring Equipment
Plans are available free online at the South Tahoe Public Utility District website at "http://www.stpud.us/constructionbids.html" or at "http://www.planetbids.com/portal/portal.cfm?CompanyID=21516" or call MKD Construction at (775) 246-1900.
MKD Construction is happy to assist interested DBEs in obtaining bonding, lines of credit or insurance, and any technical assistance of information related to or obtaining plans, specifications and requirements for the work which is provided to DBEs. MKD Construction will also assist interested DBEs in obtaining necessary equipment, supplies, materials or related assistance or services, excluding supplies and equipment the DBE subcontractor purchases or leases from us. We are a union contractor and equal opportunity employer.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.