Bridgeport Spillway Rehabilitation
18-040
Tarrant Regional Water District
Decatur, Wise County, TX
02/23/2018 at 02:00
SCOPE OF WORK
Removing the existing coatings down to bare metal on the up and downstream sides of the spillway gates, stop log, upstream 48" bypass gate, and steel superstructure.
Tighten all nuts and bolts on the superstructure after sand blasting is complete.
Grind down and fill in pits and corroded areas on the upstream side of the surface of the gates with epoxy filler for shallow pits and weld patches over deeper pits.
Remove and replace the gate seals with J-bulb seals on the 8 spillway gates & the stop log gate.
Replace corroded seals brackets and replace all nuts and bolts associated with the seal brackets. All brackets, nuts, and bolts must be stainless steel.
Correct missing and deficient welds on the spillway superstructure, including removal of and replacing damage to metal to be refurbished.
Replace cables.
We are an equal opportunity employer. Please email letters of interest to bnicholson@tmicoatings.com Bonds will not be required from qualified subcontractors.
Specifications and drawings can be downloaded free of charge at the following link https://www.civcastusa.com/project/5a62461465de80381acd0ed9/summary or contact Ben Nicholson at 651-452-6100 or bnicholson@tmicoatings.com for specifications and additional information.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.