Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Abel Canlas



Contact Information

2531 Petaluma Blvd. S
Petaluma, CA 94952



Telephone

(707) 763-8700



Fax

(707) 763-8711



Team Ghilotti
is seeking qualified MBEs, WBEss


Project Name

Stafford Lake Bike Park Trail Bridge, Headcut and Gully Stabilization Project



Bid/Contract #

N/A



Awarding Agency

MARIN COUNTY PARKS



Project Location

NOVATO, MARIN OUNTY County, CA



Bid Date

03/06/2018 at 1:00P



Project Details

We are seeking qualified MBE/WBE Subcontractors, Suppliers, Service providers for the following Items:
Survey, Stabilize Bank, Head cut, WPCP Plan, Rock Armored channels. The additional stabilization work includes, but is not limited to excavation to subgrade & placement of rock, excavating bank material and reusing downstream, excavating & placing rock for slope protection, Gabions, Rip-rap, Quarry Spalls, using fabric reinforced earth fill and coir rolls, and erosion control measures like erosion control blankets and mats and/or seeding.
Additional site improvement work includes installation of a trail bridge. This involves construction of cast in place concrete abutments and procurement and installation of a 6' wide x 23' long prefabricated bridge with redwood decking and 54" railings.



Team Ghilotti, Inc. is an equal opportunity employer. Performance and payment bonds may be required. Please call for assistance with bonding and insurance or obtaining necessary equipment, supplies, or material for this project TEAM GHILOTTI, INC. 2531 Petaluma Blvd. S., Petaluma, CA 94952 Phone (707) 763-8700 Fax: (707) 762-1430 Abel Canlas; E-mail: abelc@teamghilotti.com




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.