Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Dalia Nieto



Contact Information

250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949



Telephone

(415) 456-8972



Fax

(415) 459-0665



Thompson Builders Corporation
is seeking qualified DVBEss


Project Name

CANYON MIDDLE SCHOOL Phase 1 & 2 Modernization Project No. G 42 - 17/18



Bid/Contract #

No. G 42 - 17/18



Awarding Agency

Castro Valley Unified School District



Project Location

Castro Valley , Alameda County, CA



Bid Date

03/20/2018 at 02:00



Project Details

SCOPE: Phase 1 and 2 modernization

ESTIMATE: $7,000,000

Seeking DVBE subcontractors/suppliers/truckers. Trades needed (but not limited to): Division 05 - Metals (Decorative Metal)
Division 09 - Finishes (Cement Backer Board; Ceramic Tile; Acoustic Ceiling Tiles; Resilient Wall Base; Epoxy Flooring; Painting)
Division 10 - Specialties (Indentifying Devices; Toilet Compartments & Screens; Toilet Room Accessories)
Division 12 - Furnishings (Window Rolling Shades)
Division 23 - Heating Ventilating and Air Conditioning (Common Work Results for HVAC; Noise & Vibration; Identification for HVAC; Testing Adjusting & Balancing HVAC; Duct Insulation; HVAC Piping Insulation; Refrigerant Piping; Metal ducts; Air Duct Accessories; VRS LG; VRV Fan Coils LG; Unitary Heat Pump)
Division 26 - Electrical (Basic Electrical Requirements; Conductors and Cables; Grounding and Bonding; Seismic Controls for Electrical Work; Raceways and Boxes; Panelboard; Wiring Devices; Enclosed Switches and Circuit Breakers)
Division 28 - Electronic Safety and Security (Fire Alarm System)

Please submit your bid to us by noon on bid day.



We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato Monday through Friday from 7:30 AM to 4:30 PM or can be e-mailed upon request. Plans and specs may be downloaded from: https://tpcorp.box.com/s/ng8wcwjs3y2k1wn7gdwxy5slj6cadz1o

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.