Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Dalia Nieto



Contact Information

250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949



Telephone

(415) 456-8972



Fax

(415) 459-0665



Thompson Builders Corporation
is seeking qualified DVBEss


Project Name

Castro Valley High School - Health & Wellness Center, Project Lead the Way, and 400 Building Modernization Project



Bid/Contract #

No.G 38 - 17/18



Awarding Agency

Castro Valley Unified School District



Project Location

Castro Valley, Alameda County, CA



Bid Date

03/21/2018 at 03:00



Project Details

SCOPE: Building modernization project.

ESTIMATE: $7.5MM-$8MM

GOAL: 3% DVBE

- Division 03 Concrete (Formwork; Concrete Reinforcement; Cast-In-Place Concrete; Self Leveling Underlayment)
- Division 05 Metals (Structural Steel; Steel Decking; Cold Formed Metal Framing; Metal Fabrication)
- Division 06 Wood, Plastics, and Composites (Rough Carpentry; Miscellaneous Carpentry; Finish Carpentry; Architectural Woodwork)
- Division 07 Thermal and Moisture Protection (Thermal Insulation; Board Insulation; Roof Deck and Insulation; Water Vapor Emission Control; TPO Memebrane Roofing; Flashings & Sheet Metalwork; Roof Hatch; Joint Sealer)
- Division 08 Openings (Steel Doors & Frames; Interior Aluminum Frames; Flush Wood Doors; Access Doors & Panels; Aluminum Windows; Glass & Glazing)
- Division 09 Finishes (Lath and Portland Cement Plaster; Gypsum Sheating Board; Acoustic Ceiling Tiles; Resilient Tile Flooring; Resilient Wall Base; Resilient Sheet Flooring; Epoxy Flooring; Acoustical Insulation & Sealants; Painting; Concrete Floor Sealing)
- Division 10 Specialties (Visual Display Boards; Identifying Devices; Fire Protection Specialties)
- Division 12 Furnishings (Window Rolling Blackout Shades)
- Division 14 Conveying Systems (Hydraulic Elevators)
- Division 21 Fire Suppression (Wet-Pipe Sprinkler System)
- Division 22 Plumbing (Plumbing)
- Division 23 Hating Ventilating and Air Conditioning (Heating, Ventilation, Air Conditioning (HVAC); Common Work Results for HVAC; Noise & Vibration; Identification for HVAC; Testing Adjusting & Balancing HVAC; Duct Insulation; HVAC Piping Insulation; Refrigerant Piping; Metal Ducts; Air Duct Accessories; Package Rooftop Air Conditioning Units; Variable Refrigerant System; VRF Fan Coils)
- Division 26 Electrical (Basic Electrical Requirements; Conductors and Cables; Grounding and Bonding; Seismic Controls for Electrical Work; Raceways and Boxes; Distribution Board Panelboard; Wiring Devices; Enclosed Switches and Circuit Breakers)
- Division 27 Communications (General Technology Requirements)
- Division 28 Electronic Safety and Security (Fire Alarm System)

Please submit bids to us by noon on bid day.



We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato Monday through Friday from 7:30 AM to 4:30 PM or can be e-mailed upon request. You may download the plans and specs from the following link:
https://tpcorp.box.com/s/yxgvwy6xjj9gv2iwipw4io2a02ox6fn0

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.