Estimating Department
246 Ghilotti Ave
Santa Rosa, CA 95407
(707) 585-1221 ext. 242
(707) 585-1601
Replace Existing Culverts with 36' Reinforced Concrete Slab Bridge
04-4S7804
Department of Transportation (Caltrans)
Olema, Marin County, CA
04/03/2018 at 02:00
GCC is seeking certified DBE subcontractors, suppliers & truckers for construction (Replace Existing Culverts with 36' Reinforced Concrete Slab Bridge) on Hwy.1 in Marin County in Marin County near Olema at 1.8 miles south of Sir Francis Drake Boulevard (04-Mrn-01-24.7). Quotes requested include, but are not limited to, the following scopes of work: CAS, TRAFFIC CONTROL, EROSION CONTROL, STRUCTURAL CONCRETE, JOINT SEAL, REINFORCING STEEL, AIR BLOWN MORTAR-SHOTCRETE, FENCING, MBGR, METAL RAILING, THERMOPLASTIC TRAFFIC STRIPING & PAVEMENT MARKINGS, STREET SWEEPING, MATERIAL SUPPLIER & TRUCKING. Engineer's Estimate: $2,370,000 / DBE Goal: 14% / 110 WD / $4,800 per day LD. Submit quotes by Noon on bid date. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.
Contact: Mr. Jim Petnic (707/585-1221 or jimp@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: GCC may require Payment & Performance Bonds on all sub-contracts over $25,000 per CA. Public Contract Code Sect. 4108. G.C.C. will pay bond premiums up to 1 ½% of contract cost. GCC is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)
Plans: Plans, specs and requirements may be reviewed at our office in Santa Rosa. They may also be downloaded for free through the Department of Transportation via their website at http://www.dot.ca.gov/hq/esc/oe/contract_awards_services.html. Plans may also be viewed or purchased through local plan rooms, builder's exchanges, or Dodge Scan. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.
Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. GCC's written subcontract document execution is required of all successful subcontract bidders. A copy is available for inspection on GCC's website (www.ghilotti.com/subcontractors/documents) and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.
Insurance: As per our insurance requirements, your bid must include the cost of naming GCC as additional insured; including completed operations coverage; Use form 'CG-2010-1185' or equivalent; include Primary and Non-Contributing wording on your certificate of insurance and waiver of subrogation is required. We are an equal opportunity employer.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.