Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Sarah Maudlin



Contact Information

250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949



Telephone

(415) 456-8972



Fax

(415) 459-0665



Thompson Builders Corporation
is seeking qualified DBEss


Project Name

Culvert Replacement - Near Olema at 1.8 miles south of Sir Francis Drake Boulevard



Bid/Contract #

04-4S7804



Awarding Agency

CalTrans



Project Location

San Rafael, Marin County, CA



Bid Date

04/03/2018 at 02:00



Project Details

Thompson Builders Corp. is currently seeking quotes and proposals from ALL and DBE Subcontractors, Suppliers, and Truckers for the following work including but not limited to: LEAD COMPLIANCE PLAN; CONSTRUCTION AREA SIGNS ; TRAFFIC CONTROL SYSTEM; TEMPORARY PAVEMENT MARKING (PAINT); TEMPORARY TRAFFIC STRIPE (PAINT); CHANNELIZER (SURFACE MOUNTED); TEMPORARY SIGNAL SYSTEM; PORTABLE CHANGEABLE MESSAGE SIGN (LS); TEMPORARY RAILING (TYPE K); TEMPORARY CRASH CUSHION MODULE; JOB SITE MANAGEMENT; PREPARE WATER POLLUTION CONTROL PROGRAM; TEMPORARY COVER; TEMPORARY CHECK DAM; TEMPORARY DRAINAGE INLET PROTECTION; TEMPORARY FIBER ROLL; TEMPORARY REINFORCED SILT FENCE; TEMPORARY CONSTRUCTION ENTRANCE; TEMPORARY CONSTRUCTION ROADWAY; STREET SWEEPING; TEMPORARY ACTIVE TREATMENT SYSTEM; TEMPORARY CONCRETE WASHOUT; WATER QUALITY SAMPLING AND ANALYSIS DAY; WATER QUALITY MONITORING REPORT; WATER QUALITY ANNUAL REPORT; REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE);
TEMPORARY HIGH-VISIBILITY FENCE; TEMPORARY CONSTRUCTION MAT (LS); CLEARING AND GRUBBING (LS); ROADWAY EXCAVATION; ROCK EXCAVATION; STRUCTURE EXCAVATION (BRIDGE); STRUCTURE EXCAVATION (SOIL NAIL WALL); MOVE-IN/MOVE-OUT (EROSION CONTROL); ROLLED EROSION CONTROL PRODUCT (NETTING); HYDROMULCH; FIBER ROLLS; HYDROSEED; COMPOST (CY); CLASS 2 AGGREGATE SUBBASE; PRIME COAT; HOT MIX ASPHALT (TYPE A); PLACE HOT MIX ASPHALT DIKE (TYPE C); TACK COAT; SOIL NAIL; 24" CAST-IN-DRILLED-HOLE CONCRETE PILING; STRUCTURAL CONCRETE, BRIDGE; STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER); STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ); STRUCTURAL CONCRETE, DRAINAGE INLET; DRILL AND BOND DOWEL (CHEMICAL ADHESIVE)(LF); JOINT SEAL (MR 1/2"), BAR REINFORCING STEEL (BRIDGE); BAR REINFORCING STEEL (RETAINING WALL); STRUCTURAL SHOTCRETE; 18" ALTERNATIVE PIPE CULVERT;GEOCOMPOSITE DRAIN; 18" CORRUGATED STEEL PIPE DOWNDRAIN (.109" THICK); REMOVE CULVERT (LF); REMOVE HEADWALL; ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY); ROCK SLOPE PROTECTION FABRIC (CLASS 8); MISCELLANEOUS IRON AND STEEL; PREPARE AND STAIN SHOTCRETE; STAIN GALVANIZED SURFACES (LS); STAIN GALVANIZED SURFACES (LS); FENCE (TYPE WM, WOOD POST); TEMPORARY FENCE (TYPE CL-6); 16' WIRE MESH GATE; TEMPORARY CHAIN LINK GATE (TYPE CL-6); REMOVE FENCE; REMOVE PAVEMENT MARKER; PAVEMENT MARKER (RETROREFLECTIVE); MILEPOST MARKER; OBJECT MARKER (TYPE L-1); SPECIAL MARKER; MIDWEST GUARDRAIL SYSTEM (WOOD POST); VEGETATION CONTROL (MINOR CONCRETE); CABLE RAILING; TRANSITION RAILING (TYPE WB-31); ALTERNATIVE IN-LINE TERMINAL SYSTEM; ALTERNATIVE CRASH CUSHION SYSTEMS; CALIFORNIA ST-70 BRIDGE RAIL; 6" THERMOPLASTIC TRAFFIC STRIPE; MOBILIZATION.



We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato Monday through Friday from 7:30 AM to 4:30 PM or can be e-mailed upon request.

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.