Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Estimating Dept.



Contact Information

470 Chestnut Ridge Rd
Woodcliff Lake, NJ 7677



Telephone

(201) 571-2530



Fax

(201) 571-2600



Mass. Electric Construction Co.
is seeking qualified MBEs, WBEs, SDVOBss


Project Name

City Water Substation



Bid/Contract #

41088A



Awarding Agency

Metro-North Railroad



Project Location

Mt. Kisco, Westchester County, NY



Bid Date

05/01/2018 at 02:00



Project Details

The scope of work for this Contract generally consists of the installation of a new substation near Milepost 35, between Chappaqua and Mount Kisco stations on the Harlem Line, at the "City Water" site. The substation will be constructed to a height as specified on the drawings to avoid flooding. In addition, the new substation will have proper pumps and pits, and critical equipment elevated to improve resiliency to flash flood conditions. The work generally consists of excavating to construct a foundation and cable vault. A prefabricated substation will be installed on top of the cable vault. Rectifier transformers and auxiliary transformers will be installed on top of concrete platforms on either side of the prefabricated substation. Underground ducts will be installed from the substation to the tracks, which include AC feeders from the local utility company, DC feeders and negative returns. The proposed substation will be partially built within the wetlands.15% MBE 15% WBE 6% SDVOB



Drawings & Specifications rnContract documents, including plans & specifications are listed in our Online Plan room and are provided as a courtesy to the Bidder. The files can be viewed and downloaded. The Bidder will be required to quote in compliance with all project plans and specifications. Non-Disclosure Agreements are provided when applicable. Addenda is posted and a notification is sent to all invited bidders. rnrnInsurance RequirementsrnUpon award, Subcontractors must provide insurance in accordance with our subcontract agreement. A copy of the subcontractor agreement can be found in SmartBidNet Project Plan Room. rnrnBonding RequirementsrnFor subcontracts the Bidder shall furnish Performance and Payment Bonds equal to the full subcontract price. For Material Contracts, the Bidder shall furnish Supply Bonds in amount equal to full Material Contract price. Bond premiums are reimbursable by Kiewit/Mass. Electric Construction Co. Please provide current bond rate with Quote/Proposal or advise if you are unable to bond so that we my address this issue. rnrnSubmission of Proposals & QuotesrnProposals & Quotes from Contractors & Suppliers must be submitted at least 2 business days prior to bid due date. You can submit your quote three (3) ways: rnrn1) Upload your proposal to SmartBidNet.com, rn2) E-mail your quote/proposal to Project Estimator rn Listed or Gabrielle.Carpentier@Kiewit.com rn3) Fax your quote/proposal to our Estimating Dept. rn at(201) 571-2600rnrn




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.