Mercer-Fraser Company
is seeking qualified DBEss


Project Name

Bonded Wearing Course, Widen Roadway, Guardrail



Bid/Contract #

01-0E4704



Awarding Agency

CALTRANS



Project Location

Capella, Mendocino County, CA



Bid Date

05/08/2018 at 14:00



Project Details

1 LEAD COMPLIANCE PLAN
2 PROGRESS SCHEDULE (CRITICAL PATH METHOD)
3 DEVELOP WATER SUPPLY
4 CONSTRUCTION AREA SIGNS
5 TRAFFIC CONTROL SYSTEM
6 TYPE III BARRICADE
7 TEMPORARY PAVEMENT MARKING (PAINT)
8 TEMPORARY TRAFFIC STRIPE (PAINT)
9 CHANNELIZER (SURFACE MOUNTED)
10 CHANNELIZER (SURFACE MOUNTED) (LEFT IN PLACE)
11 PORTABLE CHANGEABLE MESSAGE SIGN (LS)
12 TEMPORARY RAILING (TYPE K)
13 RELOCATE TEMPORARY RAILING (TYPE K)
14 ALTERNATIVE TEMPORARY CRASH CUSHION SYSTEM
15 RELOCATE ALTERNATIVE TEMPORARY CRASH CUSHION SYSTEM
16 JOB SITE MANAGEMENT
17 PREPARE WATER POLLUTION CONTROL PROGRAM
18 TEMPORARY CHECK DAM
19 TEMPORARY DRAINAGE INLET PROTECTION
20 TEMPORARY FIBER ROLL
21 TEMPORARY CONSTRUCTION ENTRANCE
22 STREET SWEEPING
23 TEMPORARY CONCRETE WASHOUT
24 TREATED WOOD WASTE
25 TEMPORARY HIGH-VISIBILITY FENCE
26 CLEARING AND GRUBBING (LS)
27 ROADWAY EXCAVATION
28 ROCK EXCAVATION
29 SHOULDER BACKING
30 DITCH EXCAVATION
31 IMPORTED BORROW (CY)
32 SUBGRADE ENHANCEMENT GEOTEXTILE, CLASS B2
33 CULTIVATION
34 HYDROMULCH
35 STRAW
36 HYDROSEED
37 COMPOST (CY)
38 INCORPORATE MATERIALS
39 CLASS 2 AGGREGATE BASE (CY)
40 HOT MIX ASPHALT (TYPE A)
41 GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING FABRIC)
42 PLACE HOT MIX ASPHALT DIKE (TYPE A)
43 PLACE HOT MIX ASPHALT DIKE (TYPE E)
44 PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA)
45 BONDED WEARING COURSE-GAP GRADED
46 TACK COAT
47 REMOVE ASPHALT CONCRETE DIKE
48 COLD PLANE ASPHALT CONCRETE PAVEMENT
49 REMOVE BASE AND SURFACING
50 RAIL ELEMENT WALL
51(F) STRUCTURAL CONCRETE, DRAINAGE INLET
52(F) MINOR CONCRETE
53(F) CONCRETE BACKFILL (PIPE TRENCH)
54 24" CORRUGATED STEEL PIPE (.138" THICK)
55 18" CORRUGATED STEEL PIPE (.138" THICK)
56 18" SLOTTED CORRUGATED STEEL PIPE (.168" THICK)
57 6" PERFORATED PLASTIC PIPE UNDERDRAIN
58 18" STEEL FLARED END SECTION
59 ABANDON CULVERT (LF)
60 REMOVE CULVERT (LF)
61 REMOVE INLET
62 ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (TON)
63 ROCK SLOPE PROTECTION FABRIC (CLASS 8)
64(F) MISCELLANEOUS IRON AND STEEL
65 RESET MAILBOX
66 OBLITERATE SURFACING
67 RECONSTRUCT CHAIN LINK FENCE
68 REMOVE PAVEMENT MARKER
69 DELINEATOR (CLASS 1)
70 DELINEATOR (CLASS 2)
71 PAVEMENT MARKER (RETROREFLECTIVE)
72 UNDERDRAIN MARKER
73 MARKER (CULVERT)
74 OBJECT MARKER (TYPE N)
75 OBJECT MARKER (TYPE P)
76 REMOVE MARKER
77 REMOVE ROADSIDE SIGN
78 REMOVE ROADSIDE SIGN PANEL
79 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED)
80 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI)
81 RETROREFLECTIVE SHEETING (TYPE XI)
82 ROADSIDE SIGN - ONE POST
83 ROADSIDE SIGN - TWO POST
84 INSTALL ROADSIDE SIGN PANEL ON EXISTING POST
85 INSTALL ROADSIDE SIGN (LAMINATED WOOD BOX POST)
86 LAMINATED WOOD BOX POST (TYPE L)
87 TRANSITION RAILING (TYPE WB-31)
88 ALTERNATIVE IN-LINE TERMINAL SYSTEM
89 CONCRETE BARRIER TRANSITION
90 REMOVE GUARDRAIL
91 ADJUST GUARDRAIL
92 RESET TERMINAL SYSTEM
93 RESET END ANCHOR ASSEMBLY (TYPE SFT)
94 6" THERMOPLASTIC TRAFFIC STRIPE
95 8" THERMOPLASTIC TRAFFIC STRIPE
96 "8"" THERMOPLASTIC TRAFFIC STRIPE (BROKEN
12-3)"
97 THERMOPLASTIC PAVEMENT MARKING
98 "6"" THERMOPLASTIC TRAFFIC STRIPE (BROKEN
6-1)"
99 "6"" THERMOPLASTIC TRAFFIC STRIPE (BROKEN
12-3)"
100 "6"" THERMOPLASTIC TRAFFIC STRIPE (BROKEN
36-12)"
101 REMOVE PAINTED TRAFFIC STRIPE
102 REMOVE THERMOPLASTIC TRAFFIC STRIPE
103 REMOVE THERMOPLASTIC PAVEMENT MARKING
104 6" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT)
105 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT)
106 LIGHTING SYSTEM
107 TRAFFIC MONITORING STATION SYSTEM
109 ASPHALTIC EMULSION (BONDED WEARING COURSE)
110 MOBILIZATION



Mercer Fraser Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Mercer-Fraser Company is a union signatory contractor. Subcontractors must possess a current contractor's license, worker's compensation and insurance coverage during the entire length of the prime contract. 100% Performance and Payment Bonds may be required. Conditions or exceptions in Subcontractor's quote are expressly rejected unless accepted in writing. All Subcontractors will be required to sign our standard Subcontract Agreement. Plans and specifications are available for viewing at our office or you may call Mercer-Fraser Company for further assistance. Please call if assistance is needed in obtaining bonding, insurance, equipment, materials and supplies. Mercer-Fraser Company intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will consider all bids that may be submitted.