Mercer-Fraser Company
is seeking qualified DBEss


Project Name

Construct Roundabout



Bid/Contract #

01-0C8104



Awarding Agency

Caltrans



Project Location

Near Clearlake Oaks, Lake County, CA



Bid Date

05/23/2018 at 02:00



Project Details

Mercer-Fraser is currently requesting quotes from all qualified DBE subcontractors and/or suppliers for the following items of work:
1 LEAD COMPLIANCE PLAN
2 PROGRESS SCHEDULE (CRITICAL PATH METHOD)
3 TIME-RELATED OVERHEAD (LS)
4 CONSTRUCTION AREA SIGNS
5 TRAFFIC CONTROL SYSTEM
6 TYPE III BARRICADE
7 TEMPORARY PAVEMENT MARKING (PAINT)
8 TEMPORARY TRAFFIC STRIPE (PAINT)
9 CHANNELIZER (SURFACE MOUNTED)
10 TRAFFIC PLASTIC DRUM
11 TEMPORARY PEDESTRIAN ACCESS ROUTE
12 PORTABLE CHANGEABLE MESSAGE SIGN (LS)
13 TEMPORARY RAILING (TYPE K)
14 ALTERNATIVE TEMPORARY CRASH CUSHION
15 JOB SITE MANAGEMENT
16 PREPARE STORM WATER POLLUTION PREVENTION PLAN
17 RAIN EVENT ACTION PLAN
18 STORM WATER SAMPLING AND ANALYSIS DAY
19 STORM WATER ANNUAL REPORT
20 MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL)
21 TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX)
22 TEMPORARY COVER
23 TEMPORARY CHECK DAM
24 TEMPORARY DRAINAGE INLET PROTECTION
25 TEMPORARY FIBER ROLL
26 TEMPORARY GRAVEL BAG BERM
27 TEMPORARY CONSTRUCTION ENTRANCE
28 STREET SWEEPING
29 TEMPORARY CONCRETE WASHOUT
30 TEMPORARY HIGH-VISIBILITY FENCE
31 CLEARING AND GRUBBING (LS)
32 ROADWAY EXCAVATION
33 SHOULDER BACKING
34 IMPORTED BORROW (CY)
35 ROCK BLANKET
36 GRAVEL MULCH
37 BOULDER (TYPE A)
38 BOULDER (TYPE B)
39 MOVE-IN/MOVE-OUT (EROSION CONTROL)
40 BONDED FIBER MATRIX (SQFT)
41 ROLLED EROSION CONTROL PRODUCT (NETTING)
42 FIBER ROLLS
43 COMPOST (CY)
44 INCORPORATE MATERIALS
45 PERMANENT EROSION CONTROL ESTABLISHMENT WORK
46 LIME STABILIZED SOIL
47 CLASS 2 AGGREGATE BASE (CY)
48 HOT MIX ASPHALT (TYPE A)
49 ASPHALT BINDER (GEOSYNTHETIC PAVEMENT INTERLAYER)
50 GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING FABRIC)
51 PLACE HOT MIX ASPHALT DIKE (TYPE E)
52 PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA)
53 TACK COAT
54 COLD PLANE ASPHALT CONCRETE PAVEMENT
55 REMOVE BASE AND SURFACING
56 JOINTED PLAIN CONCRETE PAVEMENT
57 JOINTED PLAIN CONCRETE PAVEMENT (COLORIZED)
58 JOINTED PLAIN CONCRETE PAVEMENT (STAMPED)
59(F) STRUCTURAL CONCRETE, HEADWALL
60(F) STRUCTURAL CONCRETE, DRAINAGE INLET
61(F) MINOR CONCRETE (BACKFILL)
62 12" ALTERNATIVE PIPE CULVERT
63 18" ALTERNATIVE PIPE CULVERT
64 24" ALTERNATIVE PIPE CULVERT
65 24" REINFORCED CONCRETE PIPE
66 8" PERFORATED PLASTIC PIPE UNDERDRAIN
67 GEOCOMPOSITE DRAIN
68 12" ALTERNATIVE FLARED END SECTION
69 18" ALTERNATIVE FLARED END SECTION
70 24" ALTERNATIVE FLARED END SECTION
71 ABANDON CULVERT (EA)
72 REMOVE CULVERT (EA)
73 REMOVE INLET
74 REMOVE HEADWALL
75 PRECAST SLOPE PAVING (CONCRETE)
76 ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY)
77 ROCK SLOPE PROTECTION FABRIC (CLASS 8)
78 MINOR CONCRETE (CURB) (CY)
79 DETECTABLE WARNING SURFACE
80 MINOR CONCRETE (ISLAND PAVING)
81(F) MISCELLANEOUS IRON AND STEEL
82 PREPARE AND PAINT CONCRETE
83 OXIDIZING STAIN
84(F) ANTI-GRAFFITI COATING
85 FENCE (TYPE WM, METAL POST)
86 TEMPORARY FENCE (TYPE WM)
87 REMOVE WOOD FENCE
88 REMOVE FENCE (TYPE WM)
89 REMOVE CHAIN LINK FENCE
90 TEMPORARY GATE
91 REMOVE DELINEATOR
92 TEMPORARY DELINEATOR (CLASS 1)
93 PAVEMENT MARKER (RETROREFLECTIVE)
94 MARKER (CULVERT)
95 OBJECT MARKER (TYPE K-1)
96 REMOVE ROADSIDE SIGN
97 REMOVE ROADSIDE SIGN (STRAP AND SADDLE BRACKET METHOD)
98 REMOVE ROADSIDE SIGN PANEL
99 REMOVE SIGN PANEL
100 RELOCATE ROADSIDE SIGN
101 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) FOR RETROREFLECTIVE SHEETING (TYPE XI)
102 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI)
103 RETROREFLECTIVE SHEETING (TYPE XI)
104 ROADSIDE SIGN - ONE POST
105 ROADSIDE SIGN - TWO POST
106 INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD)
107 INSTALL SIGN PANEL ON EXISTING FRAME
108 INSTALL ROADSIDE SIGN PANEL ON EXISTING POST
109 VEGETATION CONTROL MAT (RUBBER OR FIBER)
110 6" THERMOPLASTIC TRAFFIC STRIPE
111 8" THERMOPLASTIC TRAFFIC STRIPE
112 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 8-4)
113 8" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 4-2)
114 THERMOPLASTIC PAVEMENT MARKING
115 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 12-3)
116 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 36-12)
117 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 17-7)
118 REMOVE THERMOPLASTIC TRAFFIC STRIPE
119 REMOVE THERMOPLASTIC PAVEMENT MARKING
120 MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION
121 TRAFFIC MONITORING STATION SYSTEM
122 TEMPORARY LIGHTING SYSTEM
123 MODIFYING EXISTING ELECTRICAL SYSTEM
124 MOBILIZATION



Mercer Fraser Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Mercer-Fraser Company is a union signatory contractor. Subcontractors must possess a current contractor's license, worker's compensation and insurance coverage during the entire length of the prime contract. 100% Performance and Payment Bonds may be required. Conditions or exceptions in Subcontractor's quote are expressly rejected unless accepted in writing. All Subcontractors will be required to sign our standard Subcontract Agreement. Plans and specifications are available for viewing at our office or you may call Mercer-Fraser Company for further assistance. Please call if assistance is needed in obtaining bonding, insurance, equipment, materials and supplies. Mercer-Fraser Company intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will consider all bids that may be submitted.