Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Rick Arias



Project Estimator

Mike Fain



Contact Information

4522 Parker Avenue, Suite 350
McClellan, CA 95652



Telephone

(916) 383-1756 ext. 7071



Fax

(916) 383-4084



Telfer Pavement Technologies, LLC
is seeking qualified DBEss


Project Name

01-Men-20-R37.8/R38.3



Bid/Contract #

01-0E4704



Awarding Agency

Caltrans



Project Location

Near Calpella, Mendocino County, CA



Bid Date

05/01/2018 at 02:00



Project Details

Telfer Pavement Technologies, LLC is requesting quotes from all qualified subcontractors and suppliers including certified UDBE/DBE firms for the following items of work, including but not limited to; Materials supply/delivery, Trucking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Job Site Management, PCMS, PWPCP, Type III Barricade, Temporary Pavement Marking (Paint), Channelizer (Surface Mounted), Channelizer (Surface Mounted) (Left In Place), Temporary Railing (Type K), Alternative Temporary Crash Cushion System, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Street Sweeping, Treated Wood Waste, Temporary High-Visibility Fence, Clearing and Grubbing, Roadway Excavation, Rock Excavation, Shoulder Backing, Ditch Excavation, Imported Borrow, Subgrade Enhancement Geotextile, Cultivation, Hydromulch, Straw, Hydroseed, Compost, Class 2 Aggregate Base, Hot Mix Asphalt, Geosynthetic Pavement Interlayer (Paving Fabric), Hot Mix Asphalt Dike (Type A, E,) and Removal, Cold Plane Asphalt Concrete, Remove Base and Surfacing, Rail Element Wall, Structural Concrete, Drainage Inlet, Minor Concrete, Concrete Backfill, Corrugated Steel Pipe, Per. Plastic Pipe, Culvert, Roadside Signs, Guardrail and Removal, Thermoplastic Traffic Stripe and Removal, Thermoplastic Pavement Marking and Removal, Rumble Strip, Lighting System, ETC. Quotations will be broken down to comparable packages as reasonably necessary. Telfer Pavement Technologies, LLC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. All Supplier and Subcontractor proposals shall be in strict accordance with said project plans, specifications, and any addenda issued.



Telfer Pavement Technologies, LLC will assist with performance and payment bonds as they may be required for the full amount of subcontract price. Telfer Pavement Technologies, LLC, will pay for bond premium up to 1.5%. Please call if you need assistance in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies. Subcontractors must possess a current contractor?s license, insurance and worker?s compensation coverage meeting Telfer Pavement Technologies, LLC requirements and will be required to sign the standard Telfer Pavement Technologies, LLC Subcontract Agreement. A copy of the insurance requirements and agreement can be obtained by contacting the Telfer Pavement Technologies, LLC?s office. Endorsements or waivers required are Additional Insured End., Primary Wording End., and a Waiver of Subrogation (GL & WC). Plans and specifications are available for viewing at our office, and or available for viewing on the Caltrans website. Please call if you need any additional assistance. Telfer Pavement Technologies, LLC intends to work cooperatively with all qualified firms seeking to supply materials, services or work on this project Telfer Pavement Technologies, LLC is an equal opportunity employer.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.