Suzie Ransom
Brad Sanders
195 Concourse Blvd. A
Santa Rosa, CA 95402
(707) 527-9968
(707) 527-0244
Mariposa Wastewater Treatment Facility Improvements
Mariposa 5-24-18
Mariposa Public Utility District
Mariposa, Mariposa County, CA
05/24/2018 at 02:00
K.G. Walters Construction is seeking qualified certified DBE subcontractors and suppliers for the Mariposa Public Utility District Wastewater Treatment Facility Improvements Project located in Mariposa, CA. Quotes requested include but aren't limited to the following scopes of work: revegetation, SWPPP, surveying, demolition, earthwork, shotcrete, ac paving, rebar, masonry, insulation, roofing, overhead doors, windows, painting, laboratory casework, pre engineered building, HVAC, electrical and instrumentation, blasting, fences, bolted steel tank, aggregates, erosion control, concrete formwork, readymix concrete, concrete pumping, precast concrete, trucking, lumber, miscellaneous metals, portable restrooms, doors, building materials, pumps, piping, valves, specialties, generator, plant equipment. Standard payment terms are 95% progress payments, 5% retention unless other terms are provided for in prime contract and bonds are provided at no cost to contractor. Subcontractors, suppliers and vendors shall apply the same affirmative steps for DBE participation as required in the specifications to be responsive.
An Equal Opportunity Employer Require 100% payment and performance bonds. Premium up to 1.5% paid by contractor.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.