Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Sonja Sommerfeldt



Project Estimator

Tim Janesofsky



Contact Information

12775 Westview Drive
Dallas, OR 97338



Telephone

(503) 623-5373



Fax

(503) 623-9117



James W. Fowler Co.
is seeking qualified DBEss


Project Name

Riverview Pump Station Upgrade



Bid/Contract #

Project No. 150001



Awarding Agency

City of Independence



Project Location

Independence , Polk County, OR



Bid Date

05/22/2018 at 02:00



Project Details

Selective demolition of existing pump station mechanical and electrical system and replacement with new and
higher capacity components. Some of the project components are as listed below:

• Construction of temporary by-pass pump facilities and controls.
• Selective demolition of existing pump station electrical, mechanical and structural systems and
components.
• Modifications and upgrades to the existing pump station including new piping, valves, mounting brackets,
braces.
• Two (2) approximately 85 horsepower pumps and associated piping, valving and structural supports.
• New approximately 150 kW auxiliary generator and electrical power and controls.
• Cleaning the wet well, removal and replacement of wet well fillets and pump bases to accommodate new
pumps and piping.
• Replacement of the existing valve vault with a new and larger vault.
• Extension of the new piping and connection to the existing force main.
• Construction of a new 14-inch force main and bored undercrossing of Ash Creek.
• Modifications to the site, access road, mechanical and electrical systems.
• Installation of temporary signing and safety protective measures.
• Installation of temporary erosion control measures and work area delineation fencing.
• Commissioning of new equipment and successful testing prior to demolition and removal of temporary
by-pass pump system.
• Final restoration of all structural and surface improvements disturbed by construction.
• Perform additional and incidental Work as called for by the Specifications and Drawings.
• Construction is to occur with the temporary pump around system fully operational until switchover to the
upgraded station has been complete.

Subcontracting and supplier opportunities are available but not limited to the following categories of work:

-Demolition
-Concrete Reinforcing
-Electrical
-Structural Metal Framing
-Dewatering
-Trucking (Dump Trucks)
-Fencing



Please follow the link below to download Specifications, Plans and Addenda issued:

http://www.jwfowler.com/subcontractors/




Copyright © 2018, DBE GoodFaith, Inc. All rights reserved.