Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Karin Romeo



Project Estimator

Erik Andresen



Contact Information

1141 Marina Way South
Richmond, CA 94804



Telephone

(510) 234-4200 ext. 26



Fax

(510) 234-4221



Alten Construction, Inc.
is seeking qualified DVBEss


Project Name

River Charter Modernization & New Construction at Salvador ES



Bid/Contract #

--



Awarding Agency

Napa Valley Unified School District



Project Location

Napa, Napa County, CA



Bid Date

05/23/2018 at 02:00



Project Details


SCOPE: Modernization & new construction of an unoccupied elementary school campus. NO PLA, but Prevailing Wage IS Required / 5% Retention / See Spec Section 00 700 Article 11 for Insurance Requirements / MEP & FS Subs MUST be prequalified to bid - applications due to District by 5/9 by 4:30 - Notification by 5/16 at 4:30 / RFI Due by 5/14 @ 5PM / NTP 6/10/18 - Complete by 8/1/19 / 1 Year Warranty

TRADES NEEDED (but not limited to): Survey; HazMat; Misc. Demo; Earthwork; Lime Treatment; Track Surfacing; Utilities; Pavement Markings; Hot Mix Asphalt; Landscape & Irrig.; CL & Orn. Steel Fences & Misc. Gates; Site & Permeable Concrete; Rebar; CIP Concrete; Concrete Floor Finishing; Structural & Misc Steel; Metal Deck; Metal Fab.; Ladders & Railings; Stair Nosings; Rough & Finish Carpentry; Cabinets; Misc. Paneling; Bit. Dampproofing; Insulation; Weather Barriers; Water Vapor Emiss. Ctrl; Metal Roof Panels; Fiber Cement Siding; Mod. Bit. Roof; Sheet Metal Flashing & Trim; Roof Specialties & Access.; Firestopping; Joint Sealants; Misc. Doors, Frames & Hdwr; Access & OH Doors; Entrances & Storefronts; Windows & Skylights; Glazing; Mirrors; Louvers; Concrete Floor Prep & Test; PC Plaster; Gyp Board; Tile; Acoustical Ceilings & Panels; Cush. Wood Floor; Resilient & Fluid-Applied Floor; Tile Carpet; Safety Floor; Wall Covering; Painting; Visual Display Bds; Signage; Toilet Access & Comparts; Fire Prot..; Lockers; Flagpoles; Stage Draperies & Track; Food Svc; Gym Equip; Window Coverings; Display Casewk; Instrument Storage; Countertops; Telescoping Bleachers; Site Furnishings; Wheelchair Lifts; Fire Suppression; Plumbing; HVAC; Electrical; Communications; and Fire Alarm.



Subcontractors must be registered with the DIR to bid on this project https://www.dir.ca.gov/dlse/dlsePublicWorks.html
Subcontractors & Suppliers are required to comply with Alten's standard subcontract(s) which can be found on our website www.altenconstruction.com

Plans & Specifications are available for review and take-off in our office. Email bids@altenconstruction.com to request download access from Procore. In order for bids to be considered, they must be received at our office by mail, phone or fax one (1) hour prior to bid closing time. PREVAILING WAGE RATES, INSURANCE FORM CG2010 11/85 (EQUIVALENT IS CG2010 0704 & CG203 COMBINED) & WEEKLY CERTIFIED PAYROLL REPORTS ARE REQUIRED. 100% PERFORMANCE & PAYMENT BONDS MAY BE REQUIRED. ALTEN CONSTRUCTION, INC. WILL PAY UP TO 1.5% OF BOND PREMIUM. WE ARE AN EQUAL OPPORTUNITY EMPLOYER.




Copyright © 2018, DBE GoodFaith, Inc. All rights reserved.