Selena Blake
POB 219
Colliersville, NY 13747
(607) 433-2100
(607) 433-2430
North River WWTP Main Hydraulic System Replacement
NR-131
NYCDEP
Manhattan, New York County, NY
05/24/2018 at 11:30
Jett Industries, Inc. is actively soliciting quotations for the North River WWTP Main Hydraulic System Replacement in Manhattan, New York. We will be bidding the project which has a combined goal of 20% MBE and WBE participation. The project bids on May 24, 2018. Please submit your detailed scopes by May 18, 2018 and Final Quotes on May 22, 2018 by 12:00.
The scope of work under this contract is to provide the necessary labor, materials and equipment to remove and replace existing Main Hydraulic System at North River WWTP. This includes the Installation 10 (Trident) actuators one on each of four forebay equalizing gates and six screening channel sluice gates, PLC, rewiring above flood level plain, PLC relay backup board and manual operation option. The contractor shall ensure that the new, replaced equipment and controls are fully operational and that the finished work is of the highest quality and meets with the approval of the Resident Engineer and the Plant Superintendent. The reconstruction shall be coordinated and approved by all associated manufacturers, Engineering and Plant Operations before commencing with the work. The contractor shall submit shop drawings to the Resident Engineer for the approval detailing the work a proposed.
We are an equal opportunity employer. The plans and specs are available for your review in our SmartBid Net Dedicated Plan Room. Please contact Selena Blake at 607-433-2100 or selena.blake@kiewit.com to be invited to the plan room.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.