Project Name

Pond D Improvements Project



Bid/Contract #

0277-1400



Awarding Agency

San Andreas Sanitary District



Project Location

San Andreas, Calaveras County, CA



Bid Date

07/27/2018 at 14:00



Project Details

Requesting Bids and Quotes for the Following
Subs/Services: Survey/Construction Staking, Trucking, Erosion Control-Hydroseeding, Fiber Roll Silt Fence, Project Signs, Structural Concrete-Headwalls, Distribution Box, Concrete Lined Ditch.
Materials: Galvanized Steel Grating, Slide Gates, Corrugated Metal Pipe (12",24"), Concrete, RCP Class V (18"), CMP Downdrain Anchor Assemblies.
Scope of Work: Construction of a new drainage diversion ditch including the installation of two parallel concrete pipes and headwalls, concrete vault, a corrugated steel pipe downdrain, energy dissipater, and riprap. Also includes site preparation, grading, trenching, erosion control and cleanup.



Ford is signatory to Operating Engineers Local 3 and Northern California District Council of Laborers unions. Subcontractors must possess a current contractor's license, workers' compensation, insurance coverage and be registered with the DIR during the entire length of the prime contract. 100% Performance and Payment Bonds from an approved Surety may be required. Conditions or exceptions in Subcontractors' quote are expressly rejected unless accepted in writing. Subcontractors will be required to sign a Ford Standard Subcontractor Agreement. Suppliers will be required to sign a Ford Purchase Order. These forms of agreements are available for review at our office. Plans and specifications are available for viewing at Ford's office or you may call Ford for further assistance. Subcontractor and Supplier quotes are required 24 hours prior to the bid date to enable complete evaluation. Assistance in obtaining bonding, insurance, equipment, materials and supplies is available to all who inquire. Ford intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will consider all bids that may be submitted