is seeking qualified DBEss


Project Name

Culvert Rehabilitation



Bid/Contract #

01-427804



Awarding Agency

California Department of Transportation



Project Location

Lake County in Various Locations, Lake County County, CA



Bid Date

07/24/2018 at 02:00



Project Details

1 LEAD COMPLIANCE PLAN 2 CONSTRUCTION AREA SIGNS 3 TRAFFIC CONTROL SYSTEM 4 PORTABLE CHANGEABLE MESSAGE SIGN (LS) 5 JOB SITE MANAGEMENT 6 PREPARE WATER POLLUTION CONTROL 7. MOVE IN/MOVE OUT (Temopary erosion control) 8. TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX) 9. TEMORARY COVER 10. TEMPORARY CHECK DAM 11. TEMPORARY DRAINAGE INLET PROTECTION 12. TEMPORARY FIBER ROLL 13. TEMPORARY SILT FENCE 14. TEMPORARY CONCRETE WASHOUT 15. WATER QUALITY SAMPLING AND ANALYSIS DAY 16. WATER QUALITY MONITORING REPORTS 17. WATER QUALITY ANNUAL REPORT 18. TEMPORARY HIGH-VISIBILITY FENCE 19. CLEARING AND GRUBBING 20. ROADWAY EXCAVATION 21. EMBANKMENT 22. DRY SEED 23. ROLLED EROSION CONTROL PRODUCT (BLANKET) 24. FIBER ROLLS 25. CLASS 2 AGGREGATE BASE 26. HOT MIX ASPHALT (TYPE A) 27. MINOR HOT MIX ASPHALT 28. PLACE HOT MIX ASPHALT DIKE (TYPE A) 29. PLACE HOT MIX ASPHALT DIKE (TYPE D) 30. PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) 31. STRUCTURAL CONCRETE, BOX CULVERT 32. STRUCTURAL CONCRETE 33. STRUCTURAL CONCRETE, DRAINAGE INLET 34. MINOR CONCRETE (MINOR STRUCTURE) 35. MINOR CONCRETE (BACKFILL) 36. 24" ALTERNATIVE PIPE CULVERT 37. 36" ALTERNATIVE PIPE CULVERT 38. 24" X 18" CORRUGATED STEEL PIPE ARCH (.109" THICK) 39. 28" X 20" CORRUGATED STEEL PIPE ARCH (.109" THICK) 40. 18" FLAP GATE 41. 24" ANCHOR ASSEMBLY 24" ALTERNATIVE PIPE DOWNDRAIN 43. 36" CORRUGATED STEEL PIPE INLET 44. 24" ALTERNATIVE FLARED END SECTION 45. 30" ALTERNATIVE FLARED END SECTION 46. 24" X 18" STEEL FLARED END PIPE ARCH SECTION 48. ABANDON CULVERT (LF) 49. REMOVE NDOWNDRAIN (EA) 50. REMOVE INLET 51. REMOVE HEADWALL 52. REMOVE FLARED END SECTION (EA) 53. CLEANING, INSPECTING, AND PREPARING CULVERT (LF) 54. 18" CURED-IN-PLACE PIPELINER 55. 24" CURED-IN-PLACE PIPELINER 56. 30" CURED-IN-PLACE PIPELINER 57. ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY) 58. CONCRETE-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY) 59. ROCK SLOPE PROTECTION FABRIC (CLASS 10) 60 MISCELLANEOUS IRON AND STEEL 61. MARKER (CULVERT) 62. VEGETATION CONTROL (MINOR CONCRETE) 63. CABLE RAILING 64. RECONSTRUCT GUARDRAIL 65. THERMOPLASTIC TRAFFIC STRIPE 66. MODIFYING EXISTING ELECTRICAL SYSTEM 67.



We are an equal opportunity employer seeking DBE subcontractors to supply cold planing, trucking,hot mix asphalt, erosion control,Water polution control. The plans and specs are available for your review athttp://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php . When submitting any bid on a public works project, please include your California Contractors License Number and Department of Industrial Relations Number. More information regarding California Contractors License and DIR Numbers can be found at http://www.cslb.ca.gov/ and http://www.dir.ca.gov/Public-Works/PublicWorks.html .