Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Verity Penland



Contact Information

P.O. Box 1006
Eureka, CA 95502



Telephone

(707) 443-6371



Fax

(707) 443-0277



Mercer-Fraser Company
is seeking qualified DBEs


Project Name

ROADWAY REALIGNMENT & NEW BRIDGE CONSTRUCTION



Bid/Contract #

02-4F8604



Awarding Agency

CALTRANS



Project Location

EAST OF FOREST GLEN, TRINITY County, CA



Bid Date

07/31/2018 at 02:00



Project Details

1 LEAD COMPLIANCE PLAN
2 PROGRESS SCHEDULE (CRITICAL PATH METHOD)
3 TIME-RELATED OVERHEAD (LS)
4 DEVELOP WATER SUPPLY
5 CONSTRUCTION AREA SIGNS
6 TRAFFIC CONTROL SYSTEM
7 PORTABLE CHANGEABLE MESSAGE SIGN (LS)
8 JOB SITE MANAGEMENT
9 PREPARE STORM WATER POLLUTION PREVENTION PLAN
10 RAIN EVENT ACTION PLAN
11 STORM WATER SAMPLING AND ANALYSIS DAY
12 STORM WATER ANNUAL REPORT
13 MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL)
14 TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX)
15 TEMPORARY TACKED STRAW
16 TEMPORARY CHECK DAM
17 TEMPORARY DRAINAGE INLET PROTECTION
18 TEMPORARY FIBER ROLL
19 TEMPORARY SILT FENCE
20 TEMPORARY STRAW BALE BARRIER
21 TEMPORARY CONSTRUCTION ENTRANCE
22 STREET SWEEPING
23 TEMPORARY CONCRETE WASHOUT
24 WATER QUALITY SAMPLING AND ANALYSIS DAY
25 WATER QUALITY MONITORING REPORT
26 WATER QUALITY ANNUAL REPORT
27 TEMPORARY CREEK DIVERSION SYSTEM
28 ASBESTOS COMPLIANCE PLAN
29 NOA BURIAL LOCATION REPORT
30 TREATED WOOD WASTE
31 CONTRACTOR-SUPPLIED BIOLOGIST (DAY)
32 NATURAL RESOURCE PROTECTION PLAN
33 INVASIVE SPECIES PREVENTION PLAN
34 DUST CONTROL PLAN (NATURALLY OCCURRING ASBESTOS)
35 TEMPORARY HIGH-VISIBILITY FENCE
36 CLEARING AND GRUBBING (LS)
37 DUST PALLIATIVE
38 ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS)
39 SHOULDER BACKING
40(F) STRUCTURE EXCAVATION (BRIDGE)
41(F) STRUCTURE EXCAVATION (BRIDGE) (NATURALLY OCCURRING ASBESTOS)
42(F) STRUCTURE BACKFILL (BRIDGE)
43 DITCH EXCAVATION
44 GEOSYNTHETIC REINFORCEMENT EMBANKMENT
45 CRUSHED ROCK
46 ROLLED EROSION CONTROL PRODUCT (JUTE MESH)
47 HYDROMULCH
48 HYDROSEED (HBGM)(SWALE)
49 HYDROSEED (HBGM)(UPLAND)
50 HYDROMULCH (FRM A)
51 HYDROMULCH (FRM B)
52 HYDROSEED
53 IMPORTED BIOFILTRATION SOIL
54 COMPOST (CY)
55 INCORPORATE MATERIALS
56 FINISHING ROADWAY
57 CLASS 2 AGGREGATE BASE (CY)
58 HOT MIX ASPHALT (TYPE A)
59 PLACE HOT MIX ASPHALT DIKE (TYPE C)
60 PLACE HOT MIX ASPHALT DIKE (TYPE D)
61 PLACE HOT MIX ASPHALT DIKE (TYPE F)
62 TACK COAT
63 COLD PLANE ASPHALT CONCRETE PAVEMENT
64 RAIL ELEMENT WALL
65 24" CAST-IN-DRILLED-HOLE CONCRETE PILING
66(F) STRUCTURAL CONCRETE, BRIDGE FOOTING
67(F) STRUCTURAL CONCRETE, BRIDGE
68(F) STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER)
69 STRUCTURAL CONCRETE, HEADWALL
70 STRUCTURAL CONCRETE, DRAINAGE INLET
71 JOINT SEAL (MR 2")
72(F) BAR REINFORCING STEEL (BRIDGE)
73(F) BAR REINFORCING STEEL (EPOXY COATED) (BRIDGE)
74 PREPARE CONCRETE BRIDGE DECK SURFACE
75 FURNISH POLYESTER CONCRETE OVERLAY
76(F) PLACE POLYESTER CONCRETE OVERLAY
77 24" CORRUGATED STEEL PIPE (.079" THICK)
78 24" STEEL FLARED END SECTION
79 ABANDON CULVERT (LF)
80 REMOVE CULVERT (LF)
81 REMOVE DOWNDRAIN (EA)
82 ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY)
83 ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY)
84 ROCK SLOPE PROTECTION (STREAMBED MATERIAL)(CY)
85 ROCK SLOPE PROTECTION FABRIC (CLASS 8)
86(F) MISCELLANEOUS IRON AND STEEL
87 DELINEATOR (CLASS 2)
88 MILEPOST MARKER
89 MARKER (CULVERT)
90 OBJECT MARKER (TYPE L-1)
91 REMOVE ROADSIDE SIGN
92 ROADSIDE SIGN - TWO POST
93 MIDWEST GUARDRAIL SYSTEM (STEEL POST)
94 TRANSITION RAILING (TYPE WB-31)
95 ALTERNATIVE IN-LINE TERMINAL SYSTEM
96(F) CALIFORNIA ST-20S BRIDGE RAIL (MODIFIED)
97 THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE)
98 MOBILIZATION



Mercer Fraser Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Mercer-Fraser Company is a union signatory contractor. Subcontractors must possess a current contractor's license, worker's compensation and insurance coverage during the entire length of the prime contract. 100% Performance and Payment Bonds may be required. Conditions or exceptions in Subcontractor's quote are expressly rejected unless accepted in writing. All Subcontractors will be required to sign our standard Subcontract Agreement. Plans and specifications are available for viewing at our office or you may call Mercer-Fraser Company for further assistance. Please call if assistance is needed in obtaining bonding, insurance, equipment, materials and supplies. Mercer-Fraser Company intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will consider all bids that may be submitted.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.