Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Cindy Orme



Project Estimator

Dan Palmer



Contact Information

870 Napa Valley Corporate Way, Suite R
Napa, CA 94558



Telephone

(707) 939-0595



Fax

(707) 940-4298



Northern Pacific Corp.
is seeking qualified DBEss


Project Name

Vineyard Road Improvement Project



Bid/Contract #

CIP Project No. 15-017 Federal Aid #STPL-5361(027)



Awarding Agency

City of Novato Dept. of Public Works



Project Location

Novato , Marin County, CA



Bid Date

09/04/2018 at 02:00



Project Details

FOUR ADDENDUMS ISSUED

Pavement rehabilitation (Cold-in Place recycling 4", 6'
daylight/edge grind, profile plane 0.15' at conforms and pave HMA surface
course 0.15') of existing roadway with roadway shoulder widening; drainage improvements at intersection of Vineyard Road and Eucalyptus Avenue; replacement of any damaged existing curb and gutter; infill existing gaps in curb, gutter and sidewalk; upgrade ADA curb ramps and accessibility features.
EE $1,055,757.00
5% DBE goal
40 Working days
$3000/L.D.'s

NPC is requesting the following trades including but not limited to: Trucking, CAS, temp. traffic control, temp. water pollution control, clear/grub, landscaping, remove/replace/install concrete curb & gutters/sidewalk/curb ramps/driveway approach/driveway conform, install 12" HDPE storm drain, install 10" C-900 PVC pipe, grinding, cold-in-place recycling, traffic signs, thermoplastic pavement striping, blue reflective pavement markers.



NPC IS AVAILABLE TO DISCUSS BREAKING OUT PORTIONS OF WORK TO ENCOURAGE PARTICIPATION.

Dan Palmer (cell 707.732.1715 or dan.palmer@northern-pacific.com) is the estimator bidding this project. He is available to answer any questions regarding scope of work, interpretation of plans, specs, bid process. NPC may also offer assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials, supplies, etc. NPC may also require payment and performance bonds. NPC will pay bond premiums up to 1-1/2% of contract cost. NPC is a NON-UNION contractor. All subcontractors performing labor on this project must pay PREVAILING WAGES and must submit CERTIFIED PAYROLL REPORTS to NPC and upload them to DIR. Plans and specs can be downloaded from the CIty of Novato Dept. of Public Works http://www.novato.org or can be viewed at local plan rooms or our office at 550 Gateway Drive, Suite 104, Napa, California.
INSURANCE: NPC requires to be named as additionally insured on all insurance certificates. Primary and non-contributing is required on certificates.
NORTHERN PACIFIC CORP. IS AN EQUAL OPPORTUNITY EMPLOYER




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.