Mike Kostenko
217 Bateman Dr.
Central Point, OR 97502
(541) 664-3010
(541) 664-1105
2017 Bridge Painting - Airport Way S Bridge Main Span over Argo RR Yard (REBID)
PW#: 2018-065
Seattle Department of Transportation
Seattle, King County, WA
09/26/2018 at 02:00
Environmental Control and Emergency Response Plan; Traffic Control; Sign, Project Identification, Owner Furnished; Field Office or Engineer's Staff; Construction Stormwater & Erosion Control (CSECP); Tree, Vegetation & Soil Protection Plan (TVSPP); Spill Plan (SP).
F. D. Thomas Inc. is a union signatory contractor. Subcontractors must possess a current contractor's license, insurance coverage and worker's compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement, 100% payment and performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies.
F. D. Thomas Inc. intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages.
Plans and specs for this project are available for your review either at our office or online:
https://www.dropbox.com/sh/ly2c088knymfj7e/AAARkAVQoyFaii0QOTXs7HTYa?dl=0
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.