Rochelle Orzech
Jeff Hollfelder
20 Happy Valley Road
Pleasanton, CA 94566
(925) 461-1500
(925) 461-0510
Replace Timber Fender Systems Surrounding Piers 6 and 7
03-3F5504
Caltrans
Sacramento, Sacramento/Yolo County, CA
10/16/2018 at 14:00
Requesting quotes for but not limited to: Lead Compliance Plan, Prepare Water Pollution Control Program, Natural Resource Protection Plan, Fiberglass Reinforced Grating. Furnish Steel Pipe Piling, Structural Steel (Bridge), Plastic Lumber, Miscellaneous Metal (Bridge), Electrical Work, Materials & Supplies. CEC is willing to breakout any portion of work to encourage DBE participation. Please fax your quotes to (925) 461-0510 or email your quotes to estimator@cecmain.com
Plans and specs are available for viewing at our Pleasanton office. They may also be viewed and downloaded from the Caltrans Website: http://www.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.phprnrn 100% Payment & Performance Bonds will be required from a single, treasury-listed surety subject to our approval. CEC will pay bond premiums up to 1.5%. Subcontractors awarded on any project will be on CEC's standard form for subcontract without any modifications. Please call for assistance in bonding, insurance, lines of credit, technical info, equipment and supplies or if any other assistance is needed. AN EQUAL OPPORTUNITY EMPLOYER
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.