Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Rochelle Orzech



Project Estimator

Jeff Hollfelder



Contact Information

20 Happy Valley Road
Pleasanton, CA 94566



Telephone

(925) 461-1500



Fax

(925) 461-0510



California Engineering Contractors, Inc.
is seeking qualified DBEss


Project Name

Seismic Retrofit, Replace Approach Slabs and Erosion Control



Bid/Contract #

04-4G8804



Awarding Agency

Caltrans



Project Location

Fremont, Alameda County, CA



Bid Date

11/09/2018 at 02:00



Project Details

Requesting quotes for but not limited to:
Lead Compliance Plan, Construction Area Signs, Traffic Control System,
Portable Changeable Message Sign, Prepare Water Pollution Control Program,
Temporary Cover, Temporary Drainage Inlet Protection, Temporary Fiber Roll,
Temporary Gravel Bag Berm, Temporary Fencing, Street Sweeping, Temporary Concrete Washout, Water Quality Sampling & Monitoring, Remove Thermoplastic Striping, Erosion Control, Hot Mix Asphalt, Micropile, Bar Reinforcing Steel (Bridge), Column Casing, Rock Slope Protection Fabric, Marking and Striping, Trucking, Materials and Supplies.

CEC is willing to breakout any portion of work to encourage
DBE participation.

Fax quotes to 925-461-0510 or email to estimator @ cecmain.com



Plans and specs are available for viewing at our Pleasanton office. 100% Payment & Performance Bonds will be required from a single, treasury-listed surety subject to our approval. CEC will pay bond premiums up to 1.5%. Subcontractors awarded on any project will be on CEC's standard form for subcontract without any modifications. Please call for assistance in bonding, insurance, lines of credit, technical info, equipment and supplies or if any other assistance is needed.

AN EQUAL OPPORTUNITY EMPLOYER




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.