Jared Wright
Jared Wright
401 Derek Place
Roseville, CA 95678
(916) 757-1000 ext. 3014
(916) 797-7400
WPUSD New High School, LLB
Flint Project #1848
Western Placer Unified School District
Lincoln, PLacer County, CA
11/14/2018 at 02:00
Trade packages include the following: 1. Field Engineering, 2. Earthwork and Paving, 3. Site Utilities, 4. Fencing, 5. Landscaping, 6. Synthetic Turf and Track, 7. Site Concrete, 8. Building Concrete, 9. Masonry, 10. Steel and Miscellaneous Metals, 11. Metal Decking, 12. Casework, 13. Waterproofing, 14. Insulation 15. Exterior Wall Panels, 16. Roofing and Sheet Metal, 17. Joint Sealants, 18. Doors, Frames, and Hardware, 19. Sectional Overhead Doors 20. Glazing, 21. Vapor Emissions Control Systems, 22. Flint Modular Wall Panel System (Under Contract), 23. Metal Stud Framing (Building A) and Gypsum Board (All Buildings), 24. Cement Plaster, 25. Tile, 26. Acoustical Ceilings, 27. Soft Flooring, 28. Concrete Floor Treatments 29. Fiberglass Reinforced Panels (FRP), 30. Tackable Wallcovering, 31. Paints and Coatings, 32. Roof Accessories, 33. Markerboards 34. Signage, 35. Electronic Signage, 36. Toilet Specialties, 37. Miscellaneous Specialties, 38. Flagpoles, 39. Lockers and Benches 40. Operable Partitions, 41. Athletic Playground Equipment, 42. Food Service Equipment, 43. Theater Equipment & Furnishings 44. Roller shades, 45. Site Furnishings, 46. Fire Suppression, 47. Plumbing, 48. HVAC, 49. Electrical, 50. Final Cleaning, 51. Elevators (Under contract), 52. Stadium Bleachers (Under Contract), 53. Telescoping Bleachers (Under Contract).
Flint Builders, Inc. is soliciting bids for trade packages for the new high school in Lincoln, CA. This project is a lease-lease-back project beginning early spring, 2019 and completing in spring of 2021. All MEPF trades must be pre-qualified with the District prior to submitting a bid. The project consists of Increments 1, 2, and 3. Increment 1 includes site improvements, (2) 2-story classroom buldings, and (2) single story science classroom buildings. Increment 2 includes the new Student Union and Administration buildings. Increment 3 includes the outdoor Stadium Bleachers and Press Box.
Flint is the selected general contractor for this project. Do not contact the architect or Owner directly.
The bid documents will be available October 16th 2018. A pre-bid meeting has been scheduled for Wednesday, October 24th, 2018 at 10:00 AM at the project site.
Bonding: Upon review of pre-qualification forms Flint reserves the right to require 100% Payment and Performance Bonds. Initial cost of Payment and Performance Bonds will be paid by Flint directly to the subcontractors surety. Subcontractors will be required to pay for any increases due to time and contract price revisions.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.