Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Heidi Faria



Project Estimator

Jean Sicard



Contact Information

1520 Fourth Street
Berkeley, CA 94710



Telephone

(510) 526-3424 ext. 3446



Fax

(510) 526-0990



O.C. Jones & Sons, Inc.
is seeking qualified DBEss


Project Name

Construct 3 Roundabouts Hwy 29 Napa



Bid/Contract #

Caltrans #04-2J1004



Awarding Agency

Caltrans



Project Location

Napa, Napa County, CA



Bid Date

12/20/2018 at 14:00



Project Details

Trucking, Lead Compliance Plan, Construction Area Signs, Traffic
Control System, Type III Barricade, Plastic Traffic Drums, Portable
Changeable Message Signs, SWPPP, Rain Event Action Plan, Storm
Water Sampling & Analysis, Sweeping, Treated Wood Waste, Biologist,
Temporary High-Visibility Fence, Clearing & Grubbing, Roadway
Excavation (Type R-1 Aerially Deposited Lead), Structure Excavation,
Structure Backfill, Cellular Concrete Lightweight Embankment Material
(Class II), Subgrade Enhancement Geotextile, Rock Blanket, Planting &
Irrigation, Hydroseed, Compost, AC Dike, Tack Coat, Cold Plane AC,
Concrete Pavement Grinding, CIDH Concrete Piling, Structural Concrete,
Minor Concrete, Textured Asphalt, Concrete Surface Texture, Bar
Reinforcing Steel, Furnish & Install Signal Pole, Pedestrian Barricade,
Underground, Adjust Utilities to Grade, Culvert Slurry-Cement Backfill,
Rock Slope Protection, Minor Concrete Curb & Gutter, Detectable Warning
Surface, Pre/Post Construction Surveys, Booster Pump, Misc. Iron & Steel,
Pedestrian Activated Warning Beacon System, Electrical, Stacked Rock Slope
Protection, Survey Monument, Obliterate Surfacing, Fencing, Delineator,
Pavement Marker, Milepost Marker, Object Marker, Roadside Signs,
Midwest Guardrail System, Vegetation Control (Minor Concrete), Chain
Link Railing, Cable Railing, Transition Railing, Alternative In-Line
Terminal System, Concrete Barrier, Thermoplastic Striping &
Marking, Painted Striping & Marking, and Construction Materials



An Equal Opportunity Employer 100% Performance & Payment Bonds may be required. Worker's Compensation Waiver of Subrogation required. Please call OCJ for assistance with bonding, insurance, necessary equipment, material and/or supplies. OCJ is willing to breakout any portion of work to encourage DBE Participation. Plans & Specs are available for viewing at our office or through the Caltrans Website at www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.