Mike Kostenko
217 Bateman Dr.
Central Point, OR 97502
(541) 664-1030
(541) 664-1105
CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES COUNTY IN LOS ANGELES AT LOS ANGELES RIVER BRIDGE AND OVERHEAD
07-305704
Caltrans
Los Angeles, Los Angeles County, CA
12/06/2018 at 02:00
LEAD COMPLIANCE PLAN; PROGRESS SCHEDULE (CRITICAL PATH METHOD); TIME-RELATED OVERHEAD (WDAY); CONSTRUCTION AREA SIGNS; TRAFFIC CONTROL SYSTEM; JOB SITE MANAGEMENT; WATER POLLUTION CONTROL PROGRAM; WORK AREA MONITORING (BRIDGE)
F. D. Thomas Inc. is a union signatory contractor. Subcontractors must possess a current contractor's license, insurance coverage and worker's compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement, 100% payment and performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies.
F. D. Thomas Inc. intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages.
Plans and specs for this project are available for your review either at our office or online:
https://www.dropbox.com/sh/6z0t4mj0k3zo387/AABwlM1YSiEokBtaqeCHxK9xa?dl=0
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.